Northern San Joaquin 230 Kilovolt (kV) Transmission Project

3 Documents in Project

Summary

SCH Number
2024010207
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Northern San Joaquin 230 Kilovolt (kV) Transmission Project
Document Type
NOD - Notice of Determination
Received
Posted
7/29/2026
Document Description
The project would loop PG&E’s existing overhead Brighton-Bellota 230 kV transmission line through an expanded PG&E Lockeford Substation and install a new overhead double-circuit 230 kV transmission line between PG&E Lockeford Substation and the proposed PG&E Thurman Switching Station at LEU's existing Industrial Substation.

Contact Information

Name
Boris Sanchez
Agency Name
California Public Utilities Commission
Job Title
Public Utilities Regulatory Analyst V
Contact Types
Lead/Public Agency

Name
Erin Rice
Agency Name
PG&E
Job Title
Senior Land Planner
Contact Types
Project Applicant
Email

Location

Cities
Lodi
Counties
San Joaquin
Regions
Northern California
Cross Streets
E Kettlemann Lane, E Thurman Road and S Guild Ave
State Highways
99, 12, 88
Railways
CCT, UPRR
Waterways
Paddy Creek, Bear Creek

Notice of Determination

Approving Agency
California Public Utilities Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.