Carmichael Water District Ladera Aquifer Storage and Recovery Project
4 Documents in Project
Summary
SCH Number
2023090687
Lead Agency
Carmichael Water District
Document Title
Carmichael Water District Ladera Aquifer Storage and Recovery Project
Document Type
NOD - Notice of Determination
Received
Posted
8/1/2025
Document Description
The proposed project would construct a new water supply well within ASR capability. The Ladera ASR Well would produce approximately 1,500 gallon per minute (gpm) and have a recharge capacity of approximately 750 gpm. The project would include related above ground improvements including a fenced perimeter, site paving, installation of a pedestal to rest the motor on, installation of a pump, and constructing a small (8 by 12 feet) prefabricated building to house the chlorine and equipment, a pad to rest electrical equipment and instrumentation controls cabinet and a small shade structure to protect it.
Contact Information
Name
Michelle Jesperson
Agency Name
Department of Water Resources
Job Title
Environmental Program Manager I
Contact Types
Responsible Agency
Phone
Name
Greg Norris
Agency Name
Carmichael Water District
Job Title
Engineering Manager
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Carmichael
Counties
Sacramento
Regions
Citywide
Cross Streets
Borrego Way
Zip
95608
Total Acres
N/A
State Highways
Interstate 80
Railways
Union Pacific Railroad
Other Location Info
Project is taking place at an existing Carmichael Water District Facility.
Notice of Determination
Approving Agency
DWR
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
715 P Street
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Mitigation Monitoring and Reporting Program)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
State Comment Letters [Comments from State Reviewing Agency(ies)]
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.