Palisade Santee Commerce Center
3 Documents in Project
Summary
SCH Number
2023090144
Lead Agency
City of Santee
Document Title
Palisade Santee Commerce Center
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2025
Document Description
On August 27, 2025, at a regularly held public meeting of the Santee City Council, the City adopted Resolution No. 112-2025 certifying the Final Environmental Impact Report (EIR) (SCH No. 2023090144), adopting Findings of Fact and a Statement of Overriding Considerations under the California Environmental Quality Act, adopting a Mitigation Monitoring and Reporting Program, and approving the proposed project.
The proposed Project includes the demolition and removal of all existing on-site structures and the construction of a 300,145 square foot industrial/warehousing building. The Project would include 290,145 square feet of warehouse space and 10,000 square feet of office space, up to 42 dock-high doors, four grade-level doors, two truck courts, 301 passenger-vehicle parking spaces, 30- and 40-foot-wide fire access lanes along the building perimeter, landscaping, and fencing along portions of the developed perimeter with automated gates at certain driveway locations. The Project would also include associated utility, stormwater treatment, and roadway improvements, such as project driveway widening, a new turn lane for eastbound traffic into the project and frontage improvements along the northern side of N. Woodside Avenue.
This building is designed to be used primarily to support warehousing and distribution, manufacturing, assembly, and/or research and development operations, and related office uses. Business operations would be conducted within the enclosed building, except for traffic movement, passenger and truck parking, the loading and unloading of trailers within designated truck courts/loading areas, and the internal and external movement of materials around the Project site via forklifts, pallet jacks, yard hostlers, and similar equipment. Truck trailers are expected to be primarily loaded and unloaded using the dock-high door positions in the north and south truck courts. The analysis in the EIR assumed that the building could be operational 24 hours per day, seven days per week, with exterior loading and parking areas illuminated at night.
The Project is consistent with the site’s existing land use designation (IL-Light Industrial) and zoning (Light Industrial – IL). A Development Review Permit (DR) is required to allow for the demolition of the existing structures on site and for the development of a new industrial building greater than 50,000 square feet in floor area and associated improvements. A Conditional Use Permit (CUP) is proposed to increase the allowable building height from 40 feet to 50 feet.
The site is not listed as a hazardous waste and substance site pursuant to Section 65962.5 of the Government Code. This includes but is not limited to lists of hazardous waste facilities, land designated as hazardous waste property, and hazardous waste disposal sites, and the information in the Hazardous Waste and Substances Statement required under subsection (f) of that Section.
Contact Information
Name
Madeline Mattson
Agency Name
City of Santee
Job Title
Principal Planner
Contact Types
Lead/Public Agency
Phone
Name
North Palisade Partners
Agency Name
North Palisade Opco, LLC
Job Title
Project Applicant
Contact Types
Project Applicant
Phone
Location
Coordinates
Cities
Santee
Counties
San Diego
Regions
Citywide
Cross Streets
N. Woodside Avenue, Wheatlands Avenue
Zip
92071
Total Acres
13.5
Jobs
750
Parcel #
381-070-5200
State Highways
SR-67, SR-52, SR-125, I-8
Railways
Trolley Line
Airports
Gillespie Field
Schools
N/A
Waterways
San Diego River
Notice of Determination
Approving Agency
City of Santee
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
https://www.cityofsanteeca.gov/business/active-projects-map or 10601 Magnolia Avenue, Santee, CA 92071
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Completion [NOC] Transmittal form
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
