Fenton Parkway Bridge Project (Streambed Alteration Agreement No. EPIMS-SDO-55913-R5)

7 Documents in Project

Summary

SCH Number
2023050534
Lead Agency
California State University, San Diego (SDSU)
Document Title
Fenton Parkway Bridge Project (Streambed Alteration Agreement No. EPIMS-SDO-55913-R5)
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2026
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification No. EPIMS-SDO-55913-R5, pursuant to Section 1602 of the Fish and Game Code to San Diego State University. The Project includes construction of the Fenton Parkway Bridge Project to connect Fenton Parkway, which currently terminates north of the San Diego River channel, with Camino Del Rio North, south of the river channel. The bridge will be approximately 450 feet long and 58 feet wide, supported on concrete seat-type abutments at each end and 3 piers within the channel. Each of the abutments would be protected with energydissipating riprap that would be buried to allow for post-construction habitat restoration over the riprap.

Contact Information

Name
Kelly Fisher
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Anne Collins-Doehne
Agency Name
The Board of Trustees of the California State University
Job Title
Director
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Southern California
Other Location Info
Northeast Mission Valley community of the City of San Diego, San Diego County, south of Fenton Parkway and north of Camino Del Rio North.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
The Final EIR prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print