Scattergood Generating Station Units 1 and 2 Green Hydrogen-Ready Modernization Project

3 Documents in Project

Summary

SCH Number
2023050366
Lead Agency
Los Angeles Department of Water and Power
Document Title
Scattergood Generating Station Units 1 and 2 Green Hydrogen-Ready Modernization Project
Document Type
NOD - Notice of Determination
Received
Posted
11/7/2025
Document Description
The Los Angeles Department of Water and Power (LADWP) proposes to construct and operate a rapid-response combined-cycle generation system (CCGS) at Scattergood Generating Station. The Proposed Project would replace the generation capacity of existing Scattergood Units 1 and 2, which are conventional natural-gas-fired steam-boiler generators that would be removed from service, with a CCGS capable of operating on a fuel mixture of natural gas and a minimum of 30 percent hydrogen by volume. The proposed CCGS would consist of a combustion-turbine generator and a steam-turbine generator operating in tandem. Additional facilities or ancillary functions required to support the proposed CCGS include, but are not limited to, an air-cooled condenser, wet-surface air cooler, gas compressors, switchyard upgrades, and a dedicated pipeline for industrial wastewater discharge. With the implementation of expanded renewable generation resources, improvements to transmission systems, increased energy storage, and other elements of the LADWP carbon-free energy system outlined in the SLTRP, LADWP’s in-basin generation units, including the Proposed Project, are anticipated to be utilized less frequently than under current conditions, primarily to meet peaks in the requirement for electrical power during high demand days that exceed renewable energy production and energy storage capacity. In addition, the CCGS would be used during relatively short-term periods when the renewable generation sources and/or transmission assets become unavailable due to emergency circumstances. Therefore, although anticipated to be operated less frequently, this firm local generation capability is crucial to maintaining the resilience and reliability of the LADWP power system. The necessary infrastructure for the production, delivery, and storage of green hydrogen needed to support the Proposed Project currently does not exist. While it is anticipated that a sufficient market supply of green hydrogen may be available to support the Proposed Project dual-fuel CCGS when it is fully commissioned by the end of 2029, the details of the green hydrogen system are currently unknown. Therefore, this DEIR does not address the supply of green hydrogen to Scattergood Generating Station, which will be analyzed in a separate environmental review and approval process when the necessary information to support an adequate analysis of potential impacts is available. LADWP would not implement or operate this hydrogen infrastructure but would be a purchaser of hydrogen to supply the Proposed Project. Nonetheless, because the combustion-turbine generator component of the proposed CCGS would be capable of operating on a mixture of natural gas and hydrogen fuel, the impacts related to the combustion of such a fuel mixture are analyzed in this DEIR. Construction of the Proposed Project is anticipated to begin in 2026 and the CCGS would be fully operational by the end of 2029.

Contact Information

Name
Jazmin Martin
Agency Name
Los Angeles Department of Water and Power
Job Title
Environmental Specialist
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Los Angeles, Playa Del Rey
Counties
Los Angeles
Regions
Citywide
Cross Streets
Vista Del Mar and Grand Avenue
Zip
90293
Total Acres
56
Parcel #
4131-027-901, 4131-027-900, 4131-028-900 (southern portion)
State Highways
HWY 1
Airports
Los Angeles Int'l Airport (LAX)
Schools
El Segundo Unified School District
Waterways
Pacific Ocean
Township
03S
Range
15W
Section
00
Other Location Info
Playa Del Rey Community

Notice of Determination

Approving Agency
Los Angeles Department of Water and Power
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
111 N Hope Street, Room 1044, Los Angeles, CA 90012 and www.ladwp.com/reports/environmental-reports

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print