749 West El Camino Real Mixed-Use Project

4 Documents in Project

Summary

SCH Number
2023050251
Lead Agency
City of Mountain View
Document Title
749 West El Camino Real Mixed-Use Project
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2025
Document Description
The project would demolish the existing 1,487 square foot restaurant building, 18,302 square foot bank building, and all associated surface parking and landscaping on-site to construct two new buildings on-site: 1) a two-story, 8,483 square foot bank building and 2) a six-story mixed-use building with 299 multi-family residential units (31 units of which would be reserved for very-low- income and two units for low-income households), 10,830 square feet of ground-floor commercial uses, and at-grade podium parking above two levels of underground parking. The commercial square footage would be located adjacent to El Camino Real on the northern portion of the project site. The new bank would be located on the northwest corner of the project site and a public plaza is proposed on El Camino Real between the proposed bank building and mixed-use building’s ground-floor commercial uses. The project would preserve the existing artwork pieces associated with the existing bank building and plaza and incorporate them into the new development. Implementation of the project would require the removal of existing trees, including Heritage Trees. The proposed project would plant replacement trees in conformance with City requirements. The project also includes utility and right-of-way improvements. The project would meet Tier 1 development standards per the El Camino Real Precise Plan and have a maximum structure height of 6 stories (or 75 feet) and a floor-area-ratio (FAR) of approximately 3.05 (98 dwelling units per acre [du/ac]). The project would utilize State Density Bonus Law to exceed the allowed zoning density of 2.3 FAR with a 46.25 percent density bonus, as calculated based on Mountain View’s Density Bonus Program Guidelines and Section 36.48.75 (General Provisions for Density Bonus) of the City Code. The project does not require a General Plan amendment or rezoning. The project approval included a Planned Community Permit, Development Review Permit, Provisional Use Permit, Heritage Tree Removal Permit, and a resolution for the vacation of public easements at the project site.

Contact Information

Name
Margaret Netto
Agency Name
City of Mountain View
Job Title
Consulting Senior Planner
Contact Types
Lead/Public Agency

Name
Daniel Deibel
Agency Name
Greystar Real Estate Partners
Job Title
Project Contact
Contact Types
Project Applicant

Location

Cities
Mountain View
Counties
Santa Clara
Regions
Citywide
Cross Streets
El Camino Real/Castro Street
Zip
94040
Total Acres
3.05
Parcel #
193-02-049, 193-02-050
State Highways
SR 85, SR 237, SR 82
Railways
Caltrain, VTA Light Rail
Schools
Bubb, Graham, MV HS
Waterways
Stevens Creek and Permanente Creek
Township
6S
Range
2W
Section
28

Notice of Determination

Approving Agency
City of Mountain View City Council
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
City of Mountain View Planning Division, 500 Castro Street, Mountain View, CA 94041

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.