Intex Corporate Office and Fulfillment Center

4 Documents in Project

Summary

SCH Number
2023040345
Lead Agency
City of Long Beach
Document Title
Intex Corporate Office and Fulfillment Center
Document Type
NOD - Notice of Determination
Received
Posted
6/11/2025
Document Description
The proposed project includes the construction of a new 60-foot-tall, 517,437 square foot combination warehouse and distribution center with accessory offices on the project site, which is 26.47 gross acres. Goods would be imported via the nearby Port of Los Angeles and Port of Long Beach, sorted, and stored on-site, and then distributed nationally from the project site. The project site would be developed with 570 parking stalls and 174 trailer parking spaces, all in an open surface parking field. Access to the project site would be taken via five driveways: one 40-foot-wide driveway at each of the proposed cul-de-sacs on Carson Street and West Via Plata Street providing access to the loading docks and other areas on the eastern side of the property; two 28-foot-wide driveways providing access to the western side of the property from Via Oro Avenue; and one 28-foot-wide driveway providing access to the southern side of the property from Carson Street. The proposed project would include the requested street vacation of Via Alcalde Avenue, located on the eastern boundary of the project site. This right-of-way, once vacated, would become part of the site to be used for vehicle and truck parking and for on-site truck turning and maneuvering. The proposed project was approved by the Long Beach City Planning Commission on May 1, 2025, but these approvals were appealed. The City Council now has jurisdiction on the discretionary approvals for Site Plan Review and the Street Vacation General Plan Conformity Finding for the proposed vacation of Via Alcalde Avenue. Separate approval of a Right-of-Way Vacation for Via Alcalde Avenue by the City Council at a later date (TBD) also is required and is processed separately by the Department of Public Works following project approval and EIR certification. A Lot Merger approval by the Zoning Administrator also is required, following completion of the street vacation. In addition, ministerial permits, including grading permits, building permits, and public works permits, would be issued by the City to allow site preparation and construction of the proposed project and off-site project infrastructure connections.

Contact Information

Name
Scott Kinsey
Agency Name
City of Long Beach
Job Title
Planner
Contact Types
Lead/Public Agency

Name
Jeffrey Pierson
Agency Name
Intex Properties South Bay Company
Job Title
President
Contact Types
Project Applicant

Location

Cities
Long Beach
Counties
Los Angeles
Regions
Citywide
Parcel #
7310-015-034, 7310-015-019, and 7310-015-023
Airports
Long Beach Airport
Other Location Info
4000 Via Oro Avenue

Notice of Determination

Approving Agency
City of Long Beach City Council
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.longbeach.gov/lbcd/planning/environmental/reports/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print