Buckman Road Bridge Replacement (Streambed Alteration Agreement EPIMS Notification No. SJN-59468-R2)

3 Documents in Project

Summary

SCH Number
2023020182
Lead Agency
San Joaquin County
Document Title
Buckman Road Bridge Replacement (Streambed Alteration Agreement EPIMS Notification No. SJN-59468-R2)
Document Type
NOD - Notice of Determination
Received
Posted
1/27/2026
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number SJN-59468-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Najee Zarif . The project consists of the demolition and replacement of the existing structurally deficient, single-lane, timber bridge over North Fork Duck Creek with a single-span, cast-in-place reinforced concrete bridge with a 10-foot-wide travel lane and two 6-foot shoulders. The new bridge will be 43.5 feet long, and 25.5 feet wide. A temporary low-water crossing will be installed approximately 20 feet west of the existing bridge, consisting of corrugated metal pipes and aggregate fill to maintain access to the project site. Construction activities will include vegetation clearing, pile driving, grading, paving, and installation of rock slope protection.

Contact Information

Name
Hailey Donaldson
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Brian Newburg
Agency Name
San Joaquin County
Contact Types
Lead/Public Agency

Location

Counties
San Joaquin
Regions
Northern California
Parcel #
187-310-09; 187-310-15; and 187-310-16.
Waterways
North Fork Duck Creek
Other Location Info
Buckman Road. Farmington

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
CDFW regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print