Phases 2 and 3 of Ardenwood Creek (Zone 5 Line P) Flood Control Channel Improvement Project Fremont, California
    2 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
                    
                
        
            
    
    
            
                
                    
                
                    
                    
                        
                
                    
                    
                                    
                        
                                    
                        
            
        
    
                    
                
            
                
            
                
            
                
    
    
    
        
                
                    
                        
                    
                
                
                    
                        
                    
                
                
                    
                    
                        
                
                    
                
                    
                
                    
                
                    
                        
                    
                
                
                    
                        
                    
                
        
    
    
    
        
                
                    
                
                    
                
                    
        
    
                Summary
                SCH Number
            
            
                2022120141
            
        
                    Lead Agency
            
            
                Alameda County Flood Control and Water Conservation District
                
            
        
                Document Title
            
            Phases 2 and 3 of Ardenwood Creek (Zone 5 Line P) Flood Control Channel Improvement Project Fremont, California
        
                Document Type
            
            
                MND - Mitigated Negative Declaration
            
        
                Received
            
            
                    Present Land Use
                
                
                    Open Space
                
            
                Document Description
            
            The purpose of the project is to improve hydraulic conveyance of the channel to meet Federal Emergency Management Agency (FEMA) flood protection standards. The project would be constructed in three phases and Phase 1 has already been completed. Phase 2 would restorepositive drainage to the earth channel by removing sediment from an approximately 2,600 LF section of the Ardenwood Creek flood control channel from 0.4 mile downstream of Paseo Padre Parkway to the Patterson Ranch Road crossing. Phase 3 would remove deteriorating culverts further 
 downstream at Patterson Ranch Road and the adjacent Tuibun Trail, the Chochenyo trail crossing, and the Demonstration Urban Stormwater Treatment (D.U.S.T.) Marsh trail crossing and replace them with clear span prefabricated bridges supported by abutments placed beyond the top of bank. The bridge foundations would be protected from scour by rock placed on the creek bank. One of the Project objectives is to reduce the slow spread of the cattail marsh and encourage more desirable seasonal wetlands occupied by pickleweed and other desirable native plant species. The
Project would accomplish this by helping to manage the high groundwater table through the deepened and positively drained Ardenwood Creek channel invert, and by removing cattails in the overbank area used for truck haulage of channel spoil. The replacement of the culverts, which restrict drainage, by clear span bridges, would also be beneficial by improving passage of flood flows, and creating new jurisdictional wetland and open water areas. Culvert to clear span bridge conversion would also help control the unwanted spread of cattails in wet and ponded areas. Phase 2 is planned for construction in the summer or fall of 2023, pending receipt of all regulatory permits. Phase 3 is planned for construction in 2024 or later, pending funding availability and separate permit acquisition. Construction may extend over two or more seasons depending on regulatory requirements and seasonal work windows.
        Contact Information
                        Name
                    
                    
                        Jame Yoo
                    
                
                        Agency Name
                    
                    
                        Alameda County Flood Control & Water Conservation District
                    
                
                            Job Title
                        
                        
                            Associate Environmental Compliance Specialist
                        
                    
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    
                            Email
                        
                        
                    Location
                    Cities
                
                Fremont
            
                    Counties
                
                Alameda
            
                    Regions
                
                San Francisco Bay Area
            
                    Cross Streets
                
                
                    The proposed project is located west of Paseo Padre Parkway, north and south of Patterson Ranch 
                
            Notice of Completion
                        State Review Period Start
                    
                    
                        State Review Period End
                    
                    
                        State Reviewing Agencies
                    
                    California Air Resources Board (ARB), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, San Francisco Bay Conservation and Development Commission (BCDC), State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
                
                            State Reviewing Agency Comments
                        
                        California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW)
                    
                        Development Types
                    
                    Other (Flood Control)
                
                        Local Actions
                    
                    General Plan Update
                
                        Project Issues
                    
                    Air Quality, Biological Resources, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Tribal Cultural Resources, Vegetation, Wetland/Riparian
                
                        Public Review Period Start
                    
                    
                        Public Review Period End
                    
                    Attachments
                        Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
                    
                    
                
                        Notice of Completion [NOC] Transmittal form
                    
                    
                
                        State Comment Letters [Comments from state reviewing agencies]
                    
                    
                Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
