Cal Poly Maritime Waterfront Master Plan - EIR Addendum No. 1
7 Documents in Project
Summary
SCH Number
2022120009
Lead Agency
California State Polytechnic University, San Luis Obispo
Document Title
Cal Poly Maritime Waterfront Master Plan - EIR Addendum No. 1
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2026
Document Description
The project modifications and refinements include extension and modification of the Phase One in-water construction work window; minor refinements to biological resources Mitigation Measure 3.3-2c; a temporary change in dredging operations to allow for up to three 24-hour continuous operations events for a limited period of 20 days per event; and refinement and clarification of repair and upgrade activities required to improve the existing trestle. The Addendum also formally documents regulatory permit refinements that have occurred since certification of the 2024 EIR.
Contact Information
Name
Scott Bloom
Agency Name
Cal Poly Solano Maritime Academy
Job Title
Campus Planner
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Vallejo
Counties
Solano
Regions
San Francisco Bay Area
Cross Streets
Maritime Academy Road and Morrow Cove Drive
Zip
94590
Total Acres
1.2
Parcel #
006-209-0030
State Highways
Highway 80; Highway 780
Waterways
Marrow Cover; Carquinez Strait; Napa River
Notice of Determination
Approving Agency
Cal Poly Solano Maritime Academy
Approving Agency Role
Lead Agency
Approved On
County Clerks
San Luis Obispo, Solano
Final Environmental Document Available at
https://afd.calpoly.edu/facilities/planning-capital-projects/master-plan/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.