Arcata Annie & Mary Trail Connectivity Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-58972-R1C)

6 Documents in Project

Summary

SCH Number
2022110030
Lead Agency
Humboldt County
Document Title
Arcata Annie & Mary Trail Connectivity Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-58972-R1C)
Document Type
NOD - Notice of Determination
Received
Posted
7/15/2026
Document Description
The Project is limited to two (2) encroachments, each a part of the larger Annie and Mary Trail Connectivity Project, which will construct approximately 3.5 miles of Class I multi-use trail, providing non-motorized transportation and recreational access. The first encroachment proposes the installation of a 40-foot bridge spanning an unnamed tributary to the Mad River. The second proposed encroachment will upgrade an existing culvert. Work for these encroachments will include isolation of the work site, excavation, installation of rock slope protection, removal of the existing culvert, replacement with new properly sized culvert, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion.

Contact Information

Name
Jonathan Hollis
Agency Name
CA Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Steve Lazar
Agency Name
Humboldt County
Job Title
Planning and Building Department
Contact Types
Lead/Public Agency

Location

Cities
Arcata
Counties
Humboldt
Regions
Northern California
Parcel #
516-271-002, 504-201-003
Waterways
Mad River watershed
Township
6N
Range
1E
Section
15
Base
Humboldt

Notice of Determination

Approving Agency
CA Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
Humboldt County Dept. of Planning and Building 3015 H Street Eureka, CA 95501 Contact: Steven Lazar Phone: 707-445-7245

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print