Eel River Bridge Seismic Retrofit
6 Documents in Project
Summary
SCH Number
2022100650
Lead Agency
California Department of Transportation, District 1
(DOT)
Document Title
Eel River Bridge Seismic Retrofit
Document Type
NOD - Notice of Determination
Received
Posted
6/6/2025
Document Description
The California Department of Transportation (Caltrans) proposes to partially replace and seismically retrofit the northbound U.S. 101 Eel River Bridge from post miles 53.7 - 54.2 near Rio Dell, Humboldt County, California. This bridge was identified in the Structure Replacement and Improvement Needs Report as a seismically vulnerable bridge. The project would replace Spans 1 through 4 of the northbound Eel River Bridge with a cast-in-place prestressed box girder bridge. The remaining Spans 5 through 8 would be seismically retrofitted. Additional work would include constructing a retaining wall to realign the northbound bridge approach. The State Lands Commission action is an approval of a 20-year General Lease – Right-of-Way Use through June 02, 2045.
Contact Information
Name
Afifa Awan
Agency Name
CA State Lands Commission
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Email
Name
Kathleen Caringi
Agency Name
Pacific Gas & Electric Company
Job Title
Land Planner (Responsible Agency phone number provided)
Contact Types
Project Applicant / Parties Undertaking Project
Phone
Email
Location
Cities
Rio Dell
Counties
Humboldt
Regions
Northern California
Other Location Info
Sovereign land in the Eel River, adjacent to Assessor’s Parcel Numbers 205-111-032 and 052-061-053
Notice of Determination
Approving Agency
CA State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.