Heartland Solar Project

4 Documents in Project

Summary

SCH Number
2022100609
Lead Agency
Fresno County
Document Title
Heartland Solar Project
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2026
Document Description
The project consists of construction, operation, and eventual decommissioning of renewable photovoltaic (PV) solar energy generation and energy storage system facilities and interconnection to the regional energy grid. Proposed solar facilities would generate approximately 300 megawatts alternating current (MWAC) of solar PV energy and have capacity to store up to 300 MW of energy on approximately 2,362 acres of private land in western Fresno County. These facilities would interconnect to the regional electrical grid via an electrical generation-tie (gen-tie) line between the solar facility and the existing Tranquillity Switching Station, which is located approximately 1.25 miles south of the solar and energy storage facility site. The project would also require other necessary infrastructure work to support interconnection and upgrades within the existing Tranquillity Switching Station, owned and operated by Pacific Gas and Electric Company (PG&E).

Contact Information

Name
Alyce Alvarez
Agency Name
Fresno County Division of Public Works and Planning
Job Title
Planner
Contact Types
Lead/Public Agency

Name
Deandra Cass
Agency Name
Clearway Energy Group
Job Title
Developer
Contact Types
Project Applicant / Parties Undertaking Project

Location

Cities
Mendota
Counties
Fresno
Regions
Countywide, Unincorporated
Cross Streets
SR 33, S. Ohio Ave, W. American Ave, S. San Bernardino Ave, Los Angeles Ave.
Zip
93640
Total Acres
2,362
Jobs
400
Parcel #
multiple; see other location information
State Highways
SR 33
Railways
None
Airports
None
Schools
None
Waterways
None
Township
15S
Range
14E
Section
var
Base
Diablo
Other Location Info
The Heartland Solar Project would be located within Sections 1, 2, 12, 13, 23 and 24, Township 15 South, Range 14 East, Mount Diablo Base and Meridian on the following Fresno County Assessor’s parcels: 028-140-38, 028-140-41, 028-160-23, 028-170-77, 028-060-84, 028-060-77, 028-101-81, 028-101-82, 028-101-85

Notice of Determination

Approving Agency
Fresno County Public Works and Planning
Approving Agency Role
Lead Agency
Approved On
County Clerk
Fresno
Final Environmental Document Available at
Fresno County Dept. of Public Works and Planning, Development Services 2220 Tulare Street; Ste. A Fresno, CA 93721 https://www.fresnocountyca.gov/Departments/Public-Works-and-Planning/divisions-of-public-works-and-planning/development-services-division/planning-and-land-use/environmental-impact-reports/eir-7564-heartland-solar

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print