Phoenix Hydroelectric Project
    2 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                
            
    
    
            
                
                    
                
                    
                    
                        
                
                    
                    
                                    
                        
                                    
            
        
    
                    
                
            
                
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                                    
                        
                    
                        
            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
    
        
                
                    
                
                    
        
    
                Summary
                SCH Number
            
            
                2022060644
            
        
                    Lead Agency
            
            
                State Water Resources Control Board
                
            
        
                Document Title
            
            Phoenix Hydroelectric Project
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    8/30/2022
                
            
                Document Description
            
            The Phoenix Hydroelectric Project (Project) is located along the South Fork Stanislaus River in Tuolumne County, California approximately 10 miles northeast of the town of Sonora.  The Project provides water to the Tuolumne Utilities District (TUD), generates power, and is required to meet streamflow requirements for the South Fork Stanislaus River. 
The major components of the Project include:  Lyons Dam and Reservoir; a cushion dam about 80 feet downstream of Lyons Dam; the Main Tuolumne Canal (MTC); Phoenix Header Box (forebay to the powerhouse); a penstock; and the Phoenix Powerhouse.  Water enters the Project from the South Fork Stanislaus River and is released from Lyons Dam (the uppermost Project component), either through the low-level outlet or radial gates, from which water flows into a regulating reservoir impounded by a cushion dam approximately 80 feet downstream of Lyons Dam.  The water behind the cushion dam is diverted into the MTC or discharged to the South Fork Stanislaus River to meet instream flow requirements.  The South Fork Stanislaus River downstream of the cushion dam flows from an elevation of about 4,200 feet above mean sea level (msl) to approximately 1,110 feet above msl at New Melones Reservoir.  Some of the water diverted into the MTC is delivered to TUD at multiple locations along the MTC.  Water that is not delivered to TUD along the MTC ultimately reaches the Phoenix Powerhouse penstock and thereby the Phoenix Powerhouse.  From the Phoenix Powerhouse, water is discharged to Powerhouse Creek and ultimately to TUD’s Phoenix Reservoir for consumptive use.  Public recreational opportunities in the Project boundary include day use areas with fishing opportunities at Lyons Reservoir and the MTC section 4 ditch as well as various hiking trails.
Phoenix Powerhouse is located at the upper end of the Tuolumne Water System, a domestic water supply system owned by TUD. Phoenix Powerhouse has an installed generation capacity of 1.6 megawatts.  PG&E is not proposing new developments; however, PG&E is proposing to modify the existing Project boundary to encompass all facilities necessary for operation and maintenance of the Project.
        Contact Information
                        Name
                    
                    
                        Eric Bradbury
                    
                
                        Agency Name
                    
                    
                        State Water Resources Control Board
                    
                
                            Job Title
                        
                        
                            Environmental Scientist
                        
                    
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Cities
                
                Sonora
            
                    Counties
                
                Tuolumne
            
                    Regions
                
                Northern California
            
                    Cross Streets
                
                
                    Lyons Reservoir Road and State Highway 108
                
            
                    Zip
                
                
                    95383
                
            
                    Total Acres
                
                
                    332.21
                
            
                    Waterways
                
                
                    South Fork Stanislaus River
                
            Notice of Determination
                        Approving Agency
                    
                    
                        State Water Resources Control Board
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        
                            County Clerk
                        
                        Tuolumne
                    
                            Final Environmental Document Available at
                        
                        
                            https://www.waterboards.ca.gov/waterrights/water_issues/programs/water_quality_cert/docs/phoenix_ferc1061/phoenix_isnd.pdf 
                        
                    Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            No
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            No
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    Attachments
                        Final Document(s) [Approved_Certified draft environmental documents]
                    
                    
                
                        Notice of Determination
                    
                    
                Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
