Keene Pavement Project (Lake or Streambed Alteration Agreement No. EPIMS-KER-62886-R4)
5 Documents in Project
Summary
SCH Number
2022030729
Lead Agency
California Department of Transportation, District 9
(DOT)
Document Title
Keene Pavement Project (Lake or Streambed Alteration Agreement No. EPIMS-KER-62886-R4)
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2026
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number EPIMS-KER-62886-R4, pursuant to Fish and Game Code section 1602, to the project Applicant, the California Department of Transportation.
The project involves the extension of existing culverts at 38 stream locations along SR 58 in Kern County. Additional work includes the replacement or addition of concrete headwalls (HW), alternate flared end sections (AFES), rock slope protection (RSP), drainage inlets (DI), and construct a new stormwater retention basin.
Contact Information
Name
Grant Piepkorn
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Cecilia Boudreau
Agency Name
Caltrans
Job Title
Lead Agency
Contact Types
Lead/Public Agency
Address
Phone
Location
Counties
Kern
Regions
Southern California
State Highways
SR 58
Other Location Info
The Project is located at 38 streams crossing State Route (SR) 58 between highway post mile (PM) 76.38 and PM R88.59 in Kern County, California. Locations 1 through 8 are unnamed tributaries to Caliente Creek, Locations 9 through 13 and 15 through 18 are unnamed tributaries to Clear Creek, Location 14 is Clear Creek, and Locations 19 through 38 are unnamed tributaries to Tehachapi Creek.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
