San Francisco Gateway Project

4 Documents in Project

Summary

SCH Number
2022030286
Lead Agency
City and County of San Francisco
Document Title
San Francisco Gateway Project
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2025
Document Description
The project site is currently occupied by four single-story structures totaling approximately 448,000 square feet of production, distribution, and repair (PDR) space. The project would demolish the existing PDR buildings onsite and construct two new multi-story PDR buildings that would provide new PDR space in the industrial area of San Francisco's Bayview neighborhood. The two three-story buildings would total approximately 1,646,000 gross square feet of enclosed floor area, or 2,160,000 gross square feet including active roofs. The project would construct new sidewalks along the site's perimeter, including Selby Street, and would create seven new curb cuts for access to each new building (14 in total). The project also would include a total of approximately 543,500 gross square feet of parking, on the first story and an active roof of each building. Approximately 1,125 parking spaces for standard automobiles would be provided, and each building would include 36 loading dock doors at level 1 with additional tenant-specific loading on the upper levels. The Project would provide 116 bicycle parking spaces in total: 100 Class 1 and 16 Class 2 spaces. Proposed on-street parking would consist of 217 diagonal and parallel striped parking stalls. In addition to sidewalks from between 10 and 16 feet wide (18-feet wide in two locations), the project would also provide streetscape improvements to the streets immediately adjacent to the project site, including street trees, mid-block bulbouts with planters, driveways and associated curb cuts, improved vehicular travel lanes and a curb and gutter system, and resurfacing the roadway in several places.

Contact Information

Name
Elizabeth White
Agency Name
San Francisco Planning Department
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Courtney Bell
Agency Name
Prologis
Job Title
Project Applicant
Contact Types
Project Applicant

Location

Cities
San Francisco
Counties
San Francisco
Regions
Citywide
Cross Streets
749 Toland Street/2000 McKinnon Avenue
Total Acres
743,800 sq ft
Parcel #
5284A/008 and 5287 /002

Notice of Determination

Approving Agency
City and County of San Francisco
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Francisco
Final Environmental Document Available at
Planning Department, 49 South Van Ness Avenue, Suite 1400, San Francisco, CA, 94103

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print