3155 El Camino Real Residential Project
2 Documents in Project
Summary
SCH Number
2022020290
Lead Agency
City of Santa Clara
Document Title
3155 El Camino Real Residential Project
Document Type
NOD - Notice of Determination
Received
Posted
7/24/2026
Document Description
Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program. Rezone from Thoroughfare Commercial (CT) to Planned Development (PD) to allow development of a 60 unit residential project and a Tentative Tract Map to create 60 for sale residential condominiums and a common lot to serve the development. Project involves demolition of three one story commercial pad buildings totaling 27,780 sq. ft. and surface parking lot.
To support the project, the City of Santa Clara requires that the project applicant (Toll Brothers) remove a deteriorated roadway bridge on Valley Water fee title property that was installed in 1968 and does not meet current City codes. The project applicant would saw-cut the top of the roadway bridge and remove the center supporting column to remove the structure. The lower section, which forms a box culvert, would be left in place. Removal of the bridge was fully analyzed as part of the City’s IS/MND. Valley Water would issue an encroachment permit to the project applicant to remove the bridge from its fee title property.
Contact Information
Name
Lisa Holm
Agency Name
Santa Clara Valley Water District
Job Title
Associate Environmental Planner
Contact Types
Responsible Agency
Phone
Email
Name
Nimisha Agrawal
Agency Name
City of Santa Clara
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Name
Edward McMahon
Agency Name
Oak Investment Group, LLC.
Job Title
Associate Environmental Planner
Contact Types
Project Applicant
Phone
Email
Location
Cities
Santa Clara
Counties
Santa Clara
Regions
Citywide
Cross Streets
El Camino Real, Calabazas Boulevard
Zip
95050
Total Acres
2.46
Jobs
75
Parcel #
220-32-057, 220-32-058
State Highways
82
Railways
South Bay Caltrain Corridor
Airports
N/A
Schools
Briarwood Elementary School, Bowers Elementary School
Waterways
San Tomas Aquino Creek, Calabazas Creek, Saratoga Creek
Notice of Determination
Approving Agency
Santa Clara Valley Water District
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
City of Santa Clara Planning Division, 1500 Warburton Avenue, Santa Clara, CA 95050
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
