Santa Fe Ranch Floodwater Capture and Recharge Basin Project

11 Documents in Project

Summary

SCH Number
2022010100
Lead Agency
East Turlock Subbasin Groundwater Sustainability Agency (ETS GSA)
Document Title
Santa Fe Ranch Floodwater Capture and Recharge Basin Project
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2026
Document Description
Consistent with the Turlock Subbasin GSP, the proposed project would decrease groundwater demand through agricultural land repurposing and utilize replenishment water and stormwater for irrigation and recharge. The proposed project is covered by the evaluation of environmental effects in the Turlock Subbasin GSP PEIR and is within the scope of the PEIR for CEQA compliance under CEQA Guidelines Section 15168. The proposed project will not result in any new impacts nor require any new mitigation measures not covered in the PEIR.

Contact Information

Name
Mike Tietze
Agency Name
East Turlock Subbasin GSA
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Unincorporated Area
Counties
Merced
Regions
Countywide, Northern California, Unincorporated
Cross Streets
East Avenue and Santa Fe Avenue
Zip
95380
Total Acres
5.6
Parcel #
041-100-009 and 041-140-018
State Highways
N/A
Railways
Union Pacific
Airports
N/A
Schools
N/A
Waterways
Mustang Creek
Township
T05S
Range
R11E
Section
22
Base
N/A

Notice of Determination

Approving Agency
East Turlock Subbasin
Approving Agency Role
Lead Agency
Approved On
County Clerk
Merced
Final Environmental Document Available at
https://turlockgroundwater.org/

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.