Knights Landing Ridge Cut Erosion Repairs Phase 2 (Streambed Alteration Agreement EPIMS Notification No. YOL-66031-R2)
7 Documents in Project
Summary
SCH Number
2021120109
Lead Agency
Knights Landing Ridge Drainage District
Document Title
Knights Landing Ridge Cut Erosion Repairs Phase 2 (Streambed Alteration Agreement EPIMS Notification No. YOL-66031-R2)
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2026
Document Description
The California Department of Fish and Wildlife (CDFW) has executed
Streambed Alteration Agreement EPIMS Notification Number YOL-66031-R2, pursuant to
section 1602 of the Fish and Game Code to the project Applicant, Knights Landing
Ridge Drainage District as represented by Meegan Nagy.
The project is limited to bank repair and levee rehabilitation where needed at erosion
sites. The objective of the Project is to repair existing eroded areas along the Knights
Landing Ridge Cut (KLRC) levees on the east and west banks to arrest or avoid stream
bank erosion that threatens the integrity of the KLRC levee system. Phase 2 will import
approximately 7,000 cubic yards of rock slope protection. Revegetation would occur
with a KLRDD-approved seed mix and vegetation will only be removed to the extent
necessary for the erosion repair.
Contact Information
Name
Ian Boyd
Agency Name
Department of Fish and Wildlife
Job Title
Senior Environmental Scientist, Supervisor
Contact Types
Responsible Agency
Phone
Email
Name
Meegan G. Nagy
Agency Name
Knights Landing Ridge Drainage District
Job Title
Project Proponent
Contact Types
Lead/Public Agency
Address
Phone
Email
Location
Coordinates
Cities
King Farms
Counties
Yolo
Regions
Northern California
Parcel #
056-230-011-000
Waterways
Sacramento River
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Yolo
Final Environmental Document Available at
CDFW regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
