Sepulveda Transit Corridor Project
2 Documents in Project
Summary
SCH Number
2021110432
Lead Agency
Los Angeles County Metropolitan Transportation Authority
(LSCMTA)
Document Title
Sepulveda Transit Corridor Project
Document Type
EIR - Draft EIR
Received
Present Land Use
Community Commercial; Residential; Open Space; Public Institution
Document Description
The Proposed Project would construct a fixed guideway public transportation line across the Santa Monica Mountains in the vicinity of the Sepulveda Pass. All of the alternatives would have a northern terminus station near the Van Nuys Metrolink/Amtrak Station and a southern terminus station near the Metro E Line (Expo) and include stations that provide connections to the Metrolink Ventura County Line, the East San Fernando Valley Transit Line, the Metro G Line, the Metro D Line, and the Metro E Line.
Alternative 1: Monorail with aerial alignment in Interstate 405 (I-405) corridor and
electric bus connection to UCLA
Alternative 1 would utilize monorail technology, with automated train operations and planned peak frequencies of 2.77 minutes. Trains would consist of up to eight cars and are expected to consist of six cars during peak periods, with each car having a capacity of 90 to 97 passengers. The southern terminus station would be adjacent to the Metro E Line Expo/Sepulveda Station, and the northern terminus station would be adjacent to the Van Nuys Metrolink Station. The length of the alignment between the terminus stations would be 15.1 miles. The monorail guideway would be entirely aerial and generally located within the Interstate I-405 right-of-way and then adjacent to the Metrolink Ventura County Line railroad tracks between I-405 and the Van Nuys Metrolink Station. In some areas, including all stations, the guideway and passenger platforms would be located on one side of the freeway. Alternative 1 would have eight aerial monorail stations: Exposition Bl (Metro E Line), Santa Monica Bl, Wilshire Bl (Metro D Line), the Getty Center, Ventura Boulevard, Metro G Line, Sherman Way and the Van Nuys Metrolink Station.
At Wilshire Bl, an aerial station would be located on the west side of I-405, and an electric bus shuttle would provide service along a 1.5-mile route between the Metro D Line Westwood/VA Station and UCLA Gateway Plaza, with an intermediate stop at Westwood Bl/Le Conte Av. The electric bus shuttle would operate at headways of 2 minutes. The Base Design maintenance and storage facility (MSF) for monorail vehicles would be located on City of Los Angeles Department of Water and Power (LADWP) property east of the Van Nuys Metrolink Station. An MSF Design Option 1 would be located on industrial property, abutting Orion Avenue, south of the LOSSAN rail corridor. An electric bus MSF would be located on the northwest corner of Pico Boulevard and Cotner Avenue.
Alternative 3: Monorail with aerial alignment in Interstate 405 (I-405) corridor and
underground alignment between the Getty Center and Wilshire Bl
Alternative 3 would utilize monorail technology, with automated train operations and planned peak frequencies of 2.77 minutes. Trains would consist of up to eight cars and are expected to consist of six cars during peak periods, with each car having a capacity of 90 to 97 passengers. The southern terminus station would be adjacent to the Metro E Line Expo/Sepulveda Station, and the northern terminus station would be adjacent to the Van Nuys Metrolink Station. The length of the alignment between the terminus stations would be 16.1 miles. The monorail guideway would be aerial for most of the alignment, with a 3.6-mile tunnel segment between the Getty Center and Wilshire Bl. The aerial alignment would generally be located within the I-405 right-of-way and then adjacent to the Metrolink Ventura County Line railroad tracks between I-405 and the Van Nuys Metrolink Station.
South of Santa Monica Bl and north of the Getty Center, the alignment of Alternative 3 would be the same as that of Alternatives 1 and 2. North of Santa Monica Bl, the alignment would diverge from the I-405 median, transition to below grade south of a proposed Wilshire Bl station, and travel underneath Westwood Village and UCLA, before returning to the I-405 corridor just south of the proposed Getty Center Station. In some areas, including all aerial stations, the guideway and passenger platforms would be located on one side of the freeway. Alternative 3 would have two underground monorail stations at Wilshire Bl and UCLA Gateway Plaza and seven aerial monorail stations: Exposition Bl (Metro E Line), Santa Monica Bl, the Getty Center, Ventura Bl, the Metro G Line, Sherman Way and the Van Nuys Metrolink
Station. The Base Design maintenance and storage facility (MSF) for monorail vehicles would be located on City of Los Angeles Department of Water and Power (LADWP) property east of the Van Nuys Metrolink Station. An MSF Design Option 1 would be located on industrial property, abutting Orion Avenue, south of the LOSSAN rail corridor.
Alternative 4: Heavy rail with underground alignment south of Ventura Bl and aerial
alignment generally along Sepulveda Bl in the San Fernando Valley
Alternative 4 would utilize steel-wheel heavy rail transit (HRT) trains, with automated train operations and planned peak frequencies of 2.5 minutes. Trains would typically consist of three cars, with each car having a capacity of 170 passengers, but could be increased to four cars. The southern terminus station would be adjacent to the Metro E Line Expo/Sepulveda Station, and the northern terminus station would be adjacent to the Van Nuys Metrolink Station. The length of the alignment between the terminus stations would be approximately 13.9 miles. The alignment would be underground between the southern terminus and a portal south of Ventura Bl in the San Fernando Valley. Between this portal and Ventura Bl, the guideway would be aerial on the east side of I-405. North of Ventura Bl, the guideway would generally be located above Sepulveda Bl until curving southeast to parallel the Metrolink Ventura County Line railroad tracks.
Alternative 4 would have four underground stations at Exposition Bl (Metro E Line), Santa Monica Bl, Wilshire Bl (Metro D Line) and UCLA Gateway Plaza, and four aerial stations at Ventura Bl, the Metro G Line, Sherman Way and the Van Nuys Metrolink Station. An MSF for HRT vehicles would be located west of Woodman Av south of the Metrolink Ventura County Line railroad tracks.
Alternative 5: Heavy rail with underground alignment including along Sepulveda Bl in
the San Fernando Valley
Alternative 5 would utilize steel-wheel HRT trains, with automated train operations and planned peak frequencies of 2.5 minutes. Trains would typically consist of three cars, with each car having a capacity of 170 passengers, but could be increased to four cars. The southern terminus station would be adjacent to the Metro E Line Expo/Sepulveda Station, and the northern terminus station would be adjacent to the Van Nuys Metrolink Station. The length of the alignment between the terminus stations would be approximately 13.8 miles. The alignment would be the same as that of Alternative 4, but it would be underground between the southern terminus and a portal south of the Metrolink Ventura County Line railroad tracks. Near the northern terminus, the alignment would be aerial parallel to the Metrolink Ventura County Line railroad tracks.
Alternative 5 would have seven underground stations at Exposition Bl (Metro E Line), Santa Monica Bl, Wilshire Bl (Metro D Line), UCLA Gateway Plaza, Ventura Bl, the Metro G Line and Sherman Way, and one aerial station at the Van Nuys Metrolink Station. An MSF for HRT vehicles would be located west of Woodman Av south of the Metrolink Ventura County Line railroad tracks.
Alternative 6: Heavy rail with entirely underground alignment including along Van Nuys Bl in the San Fernando Valley and southern terminus station on Bundy Dr
Alternative 6 would utilize the same driver-operated steel-wheel HRT trains as used on the Metro B and D lines, with planned peak frequencies of 4 minutes. Trains would consist of four to six cars and are expected to consist of six cars during peak periods, with each car having a capacity of 133 passengers. The southern terminus station would be adjacent to the Metro E Line Expo/Bundy Station, and the northern terminus station would be adjacent to the Van Nuys Metrolink Station. The length of the alignment between the terminus stations would be 12.9 miles.
The alignment would be entirely underground, with the segment on the Westside running generally northeast between the Metro E Line Expo/Bundy Station and the UCLA campus, and the segment in the San Fernando Valley located along Van Nuys Bl. Alternative 6 would have seven underground stations at Olympic Bl (Metro E Line), Santa Monica Bl (West LA Civic Center), Wilshire Bl (Metro D Line), UCLA Gateway Plaza, Ventura Bl, the Metro G Line and the Van Nuys Metrolink Station. An MSF for HRT vehicles would be located west of Woodman Av south of the Metrolink Ventura County Line railroad tracks.
Contact Information
Name
Peter Carter
Agency Name
Los Angeles County Metropolitan Transportation Authority
Job Title
Project Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Name
Steve Greene
Agency Name
HTA Partners
Job Title
Associate Vice President - Project Director—Planning
Contact Types
Consulting Firm
Phone
Email
Location
Coordinates
Cities
Los Angeles
Counties
Los Angeles
Regions
Southern California
Cross Streets
Generally between Raymer Street and Exposition Boulevard
Zip
Various
Total Acres
Various
Parcel #
Various
State Highways
I-405, US-101, I-10, SR-2
Railways
Metrolink/UPRR/LOSSAN
Airports
Van Nuys, Santa Monica
Schools
Various
Waterways
LA River
Other Location Info
Center: (34° 07' 4.59" N, 118° 27' 2.31" W)
North: (34° 12' 30.94" N, 118° 26' 5.06" W)
South: (34° 01' 38.35" N, 118° 26' 54.76" W)
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Baldwin Hills Conservancy (BHC), California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Resources Recycling and Recovery, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 7 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California Santa Monica Mountains Conservancy (SMMC), California State Coastal Conservancy (SCC), California State Lands Commission (SLC), California Transportation Commission (CATC), Colorado River Board, Department of General Services (DGS), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Drinking Water, District 15, State Water Resources Control Board, Division of Drinking Water, District 16, State Water Resources Control Board, Division of Drinking Water, District 22, State Water Resources Control Board, Division of Drinking Water, District 7, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Transportation:Rail
Local Actions
Transit Corridor
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Public Review Period Start
Public Review Period End
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.