Ethanac Road Crossing of the San Jacinto River (Streambed Alteration Agreement No. EPIMS-RIV- 40756-R6)

3 Documents in Project

Summary

SCH Number
2021090552
Lead Agency
City of Perris
Document Title
Ethanac Road Crossing of the San Jacinto River (Streambed Alteration Agreement No. EPIMS-RIV- 40756-R6)
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement (EPIMS-RIV-40756-R6), pursuant to Fish and Game Code section 1602, the project Applicant, City of Perris. The project is limited to construction of an approximately 450-foot long bridge (between abutments) crossing the San Jacinto River at Ethanac Road (Bridge) along with approximately 625 linear feet of road improvements to connect the paved portion of Ethanac Road east of the river to the proposed bridge, approximately 540 linear feet of road improvements to extend Ethanac Road from the westerly bridge abutment, and four water quality basins and storm drains to connect the water quality basins.

Contact Information

Name
Enola Fulgencio
Agency Name
Fish and Wildlife, Region 6
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Patricia Brenes
Agency Name
City of Perris
Job Title
Planning Manager
Contact Types
Lead/Public Agency

Location

Cities
Perris
Counties
Riverside
Regions
Southern California
Parcel #
330-160-007

Notice of Determination

Approving Agency
Fish and Wildlife, Region 6
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
City of Perris 135 North D Street Perris, CA 92570

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print