San Jose Data Center
9 Documents in Project
Summary
SCH Number
2021020002
Lead Agency
California Energy Commission
Document Title
San Jose Data Center
Document Type
NOD - Notice of Determination
Received
Posted
11/16/2026
Document Description
The applicant proposes to construct and operate a 396,914 square foot data center, located at 1657 Alviso-Milpitas Road in San Jose, California near an existing power plant and wastewater treatment facility. The project would consist of two single-story data center buildings. To provide reliable operation of the project in the event of loss of electrical service from the local electric utility provider, Pacific Gas and Electric Company (PG&E), the project includes 224 renewable natural gas (natural gas) generators each rated at 0.45 MW output capacity to provide electrical power to support the data center uses during utility outages, certain onsite electrical equipment interruptions or failure, and for load shedding, demand response and behind-the-meter resource adequacy ancillary services. The maximum electrical load of the project would be 99 MW, although the estimated load is 77 MW, inclusive of information technology (IT) equipment, ancillary electrical/ telecommunications equipment, and other electrical loads (administrative, heat rejection, and safety/ security). In addition, the project includes two Tier 4 diesel-powered generators (designated as administrative generators), with a 1.25 MW standby generator for the northern building and a 0.5 MW standby generator for the southern building. The project also includes an onsite 115 kilovolt (kV) substation located in the northwestern corner of the project site with two 115 kV underground electrical supply lines (approximately 0.2 mile) that would connect to PG&E’s Los Esteros Substation, located adjacent to the site. The project would require offsite linears for potable water, reclaimed water, stormwater, sanitary sewer, natural gas, and electrical.
Valley Water is approving an encroachment permit to install 315 linear feet of a 12-inch diameter HDPE pipe from their property into Coyote Creek. The piping will be used to discharge treated groundwater from the Applicant’s property to support construction of the San Jose Data Center. Piping would be installed along the surface on the applicant’s property and run through an existing pipe culvert through the western levee for Coyote Creek approximately 1400 feet north of Alviso-Milpitas Road. On the floodplain side of the levee the piping will continue along the ground surface along Valley Water property approximately 240 feet into Coyote Creek and terminate at an existing corrugated steel outfall. Where the pipe crosses the Coyote Creek maintenance road the pipe will be protected with a Road Crossing system. To install the pipe, the Applicant will access the Valley Water maintenance road to deliver the pipe. No ground disturbance or vegetation removal is required for the installation of the pipe. Discharge of groundwater will be continuous over a year-long period. Groundwater will be discharged at a rate of 100-200 gallons per minute. A monitoring system will be installed at the discharge site to monitor water quality. Applicant or Applicant’s contractor requires pedestrian access to sample Coyote Creek upstream and downstream of the discharge point. Two people will enter Coyote Creek to conduct sampling by hand. The samples will be taken daily for the first week of the discharge and then weekly thereafter. Samples will be transported off site to a laboratory for analysis. If evidence of erosion is observed, additional erosion controls including straw mats, waddles, or sandbags may be used.
Contact Information
Name
Michael Martin
Agency Name
Santa Clara Valley Water District
Job Title
Senior Water Resources Specialist
Contact Types
Responsible Agency
Phone
Name
Navin Sathi
Agency Name
Microsoft Corporation
Job Title
General Manager
Contact Types
Project Applicant / Parties Undertaking Project
Phone
Name
Lisa Worrall
Agency Name
California Energy Commission
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Jose
Counties
Santa Clara
Regions
San Francisco Bay Area
Cross Streets
1657 Alviso-Milpitas Road, San Jose
Zip
95134
State Highways
237, 880
Waterways
Coyote Creek
Notice of Determination
Approving Agency
Santa Clara Valley Water District
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
https://www.energy.ca.gov/powerplant/backup-generating-system/san-jose-data-center
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.