Clean Energy Campus Utility Improvement Project – Phase 1

14 Documents in Project

Summary

SCH Number
2020040078
Lead Agency
University of California
Document Title
Clean Energy Campus Utility Improvement Project – Phase 1
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2025
Document Description
UC Berkeley would implement the Clean Energy Campus Utility Improvement Project in at least two phases. The campus is now requesting approval for Phase 1 of the project, which would consist of a 38,000 square foot Electrified Heating and Cooling Plant (EHCP) and associated equipment, a Thermal Energy Storage (TES) tank, underground distribution network that would connect the EHCP to approximately 32 campus buildings, converting these buildings to utilize new hot and cold water utilities, upgrades to the campus electrical infrastructure to support increased power needs, and repair and improvements to the campus landscape, pathways, and roadway network in areas affected by construction of the other elements of the project.

Contact Information

Name
Brian Harrington
Agency Name
University of California, Office of the President
Job Title
Director of Physical and Environmental Planning
Contact Types
Lead/Public Agency

Location

Cities
ber, Berkeley
Counties
Alameda
Regions
Northern California, San Francisco Bay Area
Other Location Info
University of California, Berkeley campus

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum #8 to the 2021 Long Range Development Plan Environmental Impact Report )
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.