Sutter Bypass Pumping Plant Rehabilitation Project (Streambed Alteration Agreement Notification No. 1600-2020-0170-R2)
4 Documents in Project
Summary
SCH Number
2020019084
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Sutter Bypass Pumping Plant Rehabilitation Project (Streambed Alteration Agreement Notification No. 1600-2020-0170-R2)
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has extended Streambed Alteration Agreement Notification Number 1600-2020-0170-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Department of Water Resources (DWR), as represented by Mitra Emami.
Activities completed under this Agreement include: demolished abandoned control buildings at Pumping Plant (PP) No. 1 and No. 2, extended gravity drain pipes at all three PP, reconstructed levee and toe road at PP No. 3, conduit installation, and filled sump basin at PP No. 3.
Work to be completed under this extension includes: removal of existing concrete footing and apron and installation of new concrete footing, apron, and stop-log structures at Pumping Plant (PP) #1 and #2; removal of existing concrete footing and apron and installation of new concrete footing, apron, and stop-log structures at PP #3; removal of existing riprap and installation of new riprap at all PP; depositing spoils offsite; installation of fill materials for access ramps at all PP; and restoration of disturbed project areas.
Contact Information
Name
Annalise Metzger
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Mitra Emami
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Email
Location
Counties
Sutter
Regions
Northern California
Other Location Info
The Sutter Bypass Pumping Plant Rehabilitation Project consists of three locations (Pumping Plant 1: 38.931815, -121.634210; Pumping Plant 2: 39.026334, -121.726824; Pumping Plant 3: 38.931815, -121.634210) along the East Levee of the Sutter Bypass in Sutter County.
Notice of Determination
Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
CDFW's regional office
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.