Western Trunk Line Project

4 Documents in Project

Summary

SCH Number
2020019065
Lead Agency
Los Angeles Department of Water and Power
Document Title
Western Trunk Line Project
Document Type
NOD - Notice of Determination
Received
Posted
8/25/2026
Document Description
The State Water Resources Control Board (State Water Board) is funding the Project referred to internally as Western Trunk Line Project Phase 1. The Project includes the abandonment of approximately 1,660 feet of existing riveted steel main, the installation of approximately 8,450 feet of new 54-inch earthquake resistant ductile iron pipe and welded steel, and the replacement and installation of approximately 1,735 feet of varying smaller diameter mainlines to tie into the existing distribution system. The Project is identified as Phase 1 and is part of a larger, multiphase project, which is being carried out in three stages: Phase 1, Phase 2A and Phase 2B. All of the project phases are evaluated in the same Mitigated Negative Declaration (MND) titled Western Trunk Line Project. PROJECT NUMBER: 1910067-064C

Contact Information

Name
Priscilla Nguyen
Agency Name
State Water Resources Control Board, Division of Financial Assistance
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
James R. Howe
Agency Name
Los Angeles Department of Water and Power
Job Title
Environmental Specialist
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Regions
Southern California
Cross Streets
W. Gage Street, W. Florence Street, W. Manchester Avenue, W. Century Blvd, Imperial Hwy and West
Zip
90047
Total Acres
23,300 linear ft
State Highways
Interstate 110 and 105
Railways
Union Pacific Railway
Schools
LAUSD Local District West, South
Township
03S
Range
14W

Notice of Determination

Approving Agency
State Water Resources Control Board, DFA
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
Records of the financing approval and an analysis of environmental alternatives for the Project are available to the general public upon request at the State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814. The Mitigated Negative Declaration is available from the Lead Agency.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print