Western Trunk Line Project

3 Documents in Project

Summary

SCH Number
2020019065
Lead Agency
Los Angeles Department of Water and Power
Document Title
Western Trunk Line Project
Document Type
NOD - Notice of Determination
Received
Posted
6/11/2025
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The Applicant has applied for financial assistance from the State Water Board’s Drinking Water State Revolving Fund (SRF) Program for the Project referred to internally as Western Trunk Line Project. The components of the Project, to be funded by the State Water Resources Control Board, include the abandonment of approximately 11,900 feet of existing riveted steel main, the installation of approximately 11,900 feet of new 36-inch main consisting of earthquake resistant ductile iron pipe and welded steel, and the replacement and installation of approximately 7,000 feet of varying smaller diameter mainlines to tie into the existing distribution system. The Project is identified as Phase 2A and is part of a larger, multi-phase project, which is being carried out in three stages: Phase 1, Phase 2A and Phase 2B. All of the project phases are evaluated in the same Mitigated Negative Declaration titled Western Trunk Line Project.

Contact Information

Name
Sarah Adler
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
James R. Howe
Agency Name
Los Angeles Department of Water and Power
Job Title
Environmental Specialist
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles
Counties
Los Angeles
Regions
Southern California
Other Location Info
Western Avenue, from 59th Place to Century Boulevard, City of Los Angeles, Los Angeles County

Notice of Determination

Approving Agency
State Water Board, Division of Financial Assistance
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
Project records and an analysis of environmental alternatives for the Project are available to the general public upon request at the State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814. The Mitigated Negative Declaration is available from the Lead Agency.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print