Middle Camp Creek Fisheries Restoration Project: Phase II

81 Documents in Project

Summary

SCH Number
2019100230
Lead Agency
California Regional Water Quality Control Board, North Coast Region 1 (RWQCB)
Document Title
Middle Camp Creek Fisheries Restoration Project: Phase II
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2026
Document Description
The proposed project is located along an approximately one-mile reach of Camp Creek, encompassing roughly 20 acres. The project will place approximately 850 logs within the stream channel and adjacent floodplain to enhance aquatic habitat. Floodplain excavation will occur to create side channels, off-channel ponds, and channel relief features. A gabion wall will be removed from the creek bank, and temporary bridges will be installed to allow equipment access across the channel. Excavated soil will be placed in designated upland areas within the project site. Vegetation management will include grubbing alders and non-native blackberry within the project area. Conifers encroaching into huckleberry patches will be selectively thinned, and these trees will be used to construct the in-stream wood structures. Heavy equipment, including excavators and dump trucks, will be used to complete the work.

Contact Information

Name
Jacob Shannon
Agency Name
North Coast Regional Water Quality Control Board
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Lead/Public Agency

Name
LeRoy Cyr
Agency Name
Six Rivers National Forest, U.S. Forest Service
Job Title
District Fish Biologist
Contact Types
Project Applicant

Location

Cities
Orleans
Counties
Humboldt
Regions
Northern California

Notice of Determination

Approving Agency
North Coast Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Programmatic Environmental Impact Report)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.