2026 East End Horse Stable Project, Addendum to the Previously Adopted Final Initial Study (IS) and Mitigated Negative Declaration (MND) for the Proposed Draina
5 Documents in Project
Summary
SCH Number
2019099080
Lead Agency
City of San Juan Capistrano
Document Title
2026 East End Horse Stable Project, Addendum to the Previously Adopted Final Initial Study (IS) and Mitigated Negative Declaration (MND) for the Proposed Draina
Document Type
NOD - Notice of Determination
Received
Posted
8/24/2026
Document Description
Full Title: 2026 East End Horse Stable Project, Addendum to the Previously Adopted Final Initial Study (IS) and Mitigated Negative Declaration (MND) for the Proposed Drainage Improvements and Restoration Activities at the Rancho Mission Viejo Riding Park at San Juan Capistrano
Premier Equisport Events, LLC (Premier) operates the City-owned Riding Park property at the Rancho Mission Viejo Riding Park, San Juan Capistrano, pursuant to a Ground Lease approved by the City Council in July 2025. Premier is responsible for operating and maintaining the property's existing water quality infrastructure, known as the Concentrated Animal Feeding Operation (CAFO) Water Quality Improvements.
Premier proposes the 2026 East End Horse Stable Project, which includes: (1) eight standard-size row-stall horse barns similar to, or the same as, the existing horse barns on-site, which would be approximately 9 feet in height and would include 10-foot by 12-foot stalls arranged side-by-side in two rows, accommodating up to approximately 315 stalls total; and (2) berms and a dedicated stormwater capture and infiltration basin intended to isolate and manage stormwater generated by the new horse stables. The proposed system would operate independently from the existing CAFO water quality infrastructure.
The proposed project was evaluated under CEQA through an Addendum to the previously adopted 2020 Mitigated Negative Declaration. The Addendum concludes that the project would not result in new significant environmental impacts or substantially increase the severity of impacts previously identified. The existing Mitigation Monitoring and Reporting Program remains applicable, and no additional mitigation measures are required. Premier has also received the necessary authorization from the San Diego Regional Water Quality Control Board under the applicable Industrial General Permit framework.
On August 18, 2026 the City Council of the City of San Juan Capistrano, after considering the Addendum and the IS/MND, adopted the Addendum, found the 2026 East End Horse Stable Project “functionally equivalent” to the previous Drainage Improvements and Restoration Activities, and approved the Revised Project.
Contact Information
Name
Matisse Reischl
Agency Name
City of San Juan Capistrano
Job Title
Assistant City Manager
Contact Types
Lead/Public Agency
Phone
Name
Tom Winsor
Agency Name
Premier Equisport Events, LLC
Job Title
CEO
Contact Types
Project Applicant
Phone
Location
Cities
San Juan Capistrano
Counties
Orange
Regions
Southern California
Zip
92675
Other Location Info
30753 Avenida La Pata, San Juan Capistrano, CA 92675
Notice of Determination
Approving Agency
City of San Juan Capistrano
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
City of San Juan Capistrano, Development Services Department, 32400 Paseo Adelanto, San Juan Capistrano, CA 92675
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.