SDDR Phases 4 & 5 (Streambed Alteration Agreement Notification No. 1600- 2019-0111-R2) Extend

16 Documents in Project

Summary

SCH Number
2019049138
Lead Agency
California Department of Water Resources (DWR)
Document Title
SDDR Phases 4 & 5 (Streambed Alteration Agreement Notification No. 1600- 2019-0111-R2) Extend
Document Type
NOD - Notice of Determination
Received
Posted
10/13/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number 1600-2019-0111-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the California Department of Water Resources, as represented by Mitra Emami. This extension allows erosion repair at Site 55. Vegetation will be cleared, disturbed soils and rocks will be excavated, and the bank slope will be shaped for stability. Geotextile fabric will be installed and soil filled rockfill will be placed from the top of the repair area. A soil layer will be placed onto the repair area and hydroseeded with a native seed mix. Instream woody material and willow pole cuttings will be installed. All excavated materials will be hauled offsite.

Contact Information

Name
Kristin Ford
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency

Name
Annalise Metzger
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
San Joaquin
Regions
Northern California
Other Location Info
Site 55 is located on the west bank of the San Joaquin River

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
CDFW regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print