Christian Valley Park CSD Water Storage Tank Project

4 Documents in Project

Summary

SCH Number
2018032041
Lead Agency
Christian Valley Park Community Services District
Document Title
Christian Valley Park CSD Water Storage Tank Project
Document Type
NOD - Notice of Determination
Received
Posted
5/7/2026
Document Description
The Christian Valley Park CSD Tank Project would construct two 0.75 MG water storage tanks on a 1.75 acre site to replace existing storage volume stored in the existing reservoir of the project site. The cover of the old storage reservoir has deteriorated such that it was considered too much of a risk, and replacing the cover would be too costly and would result in a substandard project compared to replacing the reservoir with steel tanks. The applicant proposes to operate two new water storage tanks they constructed as part of thier public water system.

Contact Information

Name
Don S. Elias
Agency Name
CHRISTIAN VALLEY PARK CSD
Job Title
General Manager
Contact Types
Lead/Public Agency / Project Applicant

Name
Gerry LaBudde
Agency Name
CHRISTIAN VALLEY PARK CSD
Job Title
Contract Operator
Contact Types
Lead/Public Agency / Project Applicant

Name
Luis Ching
Agency Name
CHRISTIAN VALLEY PARK CSD
Job Title
Chief Plant Operator
Contact Types
Lead/Public Agency / Parties Undertaking Project

Name
Shane Burr
Agency Name
CHRISTIAN VALLEY PARK CSD
Job Title
Manager
Contact Types
Lead/Public Agency / Parties Undertaking Project

Location

Cities
Auburn
Counties
Placer
Regions
Northern California
Cross Streets
West Ridge Circle and Pondorex Road
Zip
95602
State Highways
Highway 80

Notice of Determination

Approving Agency
State Water Resource Control Board, Division of Drinking Water
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Placer
Final Environmental Document Available at
11060 White Rock Road, Suite 150-A, Rancho Cordova, CA 95670

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print