1100 E 5th Street

5 Documents in Project

Summary

SCH Number
2018021069
Lead Agency
City of Los Angeles
Document Title
1100 E 5th Street
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2025
Document Description
The 1100 East 5th Street Project (Project) proposes the demolition of three existing warehouse buildings and a surface parking lot for the construction of an eight-story mixed-use building comprised of 220 live/work units, of which 11 percent (25 units) would be deed-restricted for Very Low Income (VLI) households, 46,548 square feet of commercial uses, and three subterranean parking levels. The Project would total 249,758 square feet of floor area on a 1.2-acre site, resulting in a Floor Area Ratio (FAR) of 4.77:1. The Project includes a Flexibility Option that provides the flexibility to replace 20 live/work units with an additional 17,765 square feet of commercial uses, with no other changes to the scope of the Project. The Project Site is located at 1100 E. 5th St. and 506-530 S. Seaton St., Los Angeles, CA 90013.

Contact Information

Name
Kathleen King
Agency Name
City of Los Angeles
Job Title
City Planner
Contact Types
Lead/Public Agency

Name
WW-5th & Seaton LLC, XF-5th & Seaton LLC
Agency Name
Maxxam Enterprises
Job Title
Applicant
Contact Types
Project Applicant

Location

Counties
Los Angeles
Regions
Citywide
Cross Streets
5th Street and Seaton Street

Notice of Determination

Approving Agency
City of Los Angeles
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://planning.lacity.gov/development-services/eir/1100-e-5th-street-project-1

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print