Northside Canal Flumes 3 and 4 Replacement Project (Lake or Streambed Alteration Agreement No. EPIMS-MER-63650-R4)

18 Documents in Project

Summary

SCH Number
2017051054
Lead Agency
Madera Irrigation District
Document Title
Northside Canal Flumes 3 and 4 Replacement Project (Lake or Streambed Alteration Agreement No. EPIMS-MER-63650-R4)
Document Type
NOD - Notice of Determination
Received
Posted
9/17/2026
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement Notification No. EPIMS-MER-63650-R4, pursuant to Fish and Game Code section 1602, to Merced Irrigation District. The Project includes activities related to the reconstruction of the Northside Canal Flumes 3 and 4 over unnamed ephemeral streams. Specific activities include grading, removal of the existing elevated wooden flume structure, installation of a new canal embankment, construction of a new concrete culvert, installation of access road over new embankment, installation of riprap, and vegetation removal. The new culvert, new embankment and concrete canal will be constructed within the alignment of the existing wooden flume structure.

Contact Information

Name
Jackson Powell
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Mike Morris
Agency Name
Merced Irrigation District
Job Title
Planning manager
Contact Types
Lead/Public Agency

Location

Cities
Snelling
Counties
Merced
Regions
Southern California
Cross Streets
LaGrange Road
Parcel #
043-010-007-000
Waterways
Northside Canal

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Merced
Final Environmental Document Available at
Merced Irrigation District 744 W. 20th Street Merced, California 95340

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print