Update to the 2018 UC San Diego La Jolla Campus Long Range Development Plan
28 Documents in Project
Summary
SCH Number
2016111019
Lead Agency
University of California
Document Title
Update to the 2018 UC San Diego La Jolla Campus Long Range Development Plan
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2025
Document Description
The La Jolla Campus Long Range Development Plan (2018 LRDP) was approved by the Regents of the University of California (UC) in November 2018. As a result of high demand and to support the shared goal of the State of California and the UC system to increase access to higher education, UC San Diego has experienced higher rates of enrolled students and associated campus population growth than was projected at the adoption of the 2018 LRDP. The proposed Update to the 2018 LRDP (Amendment #1) revises the previous campus population growth and development projections, makes minor land-use modifications, and extends the planning horizon year from 2035 to 2040. Amendment #1 proposes a total campus population of 96,300 (including students, staff, and faculty) and development of up to approximately 36.2 million gross square feet of building space by the 2040 planning horizon, increases of approximately 45 percent and 30 percent, respectively.
Contact Information
Name
Brian Harrington
Agency Name
University of California, Office of the President
Job Title
Director of Physical and Environmental Planning
Contact Types
Lead/Public Agency
Phone
Location
Cities
La Jolla, San Diego
Counties
San Diego
Regions
Southern California
Other Location Info
University of California San Diego, La Jolla Campus
Notice of Determination
Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.