Regulation 11-18: Reduction of Risk From Air Toxic Emissions at Existing Facilities

4 Documents in Project

Summary

SCH Number
2016102043
Lead Agency
Bay Area Air Quality Management District (BAAQMD)
Document Title
Regulation 11-18: Reduction of Risk From Air Toxic Emissions at Existing Facilities
Document Type
NOD - Notice of Determination
Received
Posted
6/5/2026
Document Description
Air District Regulation 11, Rule 18: Reduction of Risk from Air Toxic Emissions at Existing Facilities (Rule 11-18) was adopted by the Air District on November 14, 2017 to address facilities whose emissions of toxic air contaminants (TACs) pose an elevated risk to nearby residents and workers. The purpose of Rule 11-18 is to prioritize existing facilities with the highest health impacts across the Bay Area and require them to reduce those impacts. Rule 11-18 requires existing facilities with health risks above specified risk action level thresholds to either reduce those health risks below the Rule’s risk action thresholds or implement Best Available Retrofit Control Technology for Toxics on all significant sources of health risks. When Rule 11-18 was adopted, a Recirculated Final Environmental Iimpact Report (RFEIR) was prepared and certified for the project, which found that the project would have significant impacts in the areas of air quality, greenhouse gases, hazards and hazardous materials, and water supply. At that time, the Air District adopted findings pursuant to CEQA Guidelines section 15091 and a statement of overriding considerations. The Air District has now amended Rule 11-18 in an effort to address delays in rule implementation. Several amendments address Health Risk Assessment (HRA) procedures, including: (1) requiring facilities to prepare preliminary HRAs using Air District-approved modeling protocols; (2) formalizing the current practice of holding a public comment period on the preliminary HRA concurrent with the existing 90-day comment period for the facility; and (3) outlining what happens when additional testing or emissions data may affect the facility’s HRA results and Risk Action Level status. Amendments are also made to Risk Reduction Plans (RRP) procedures, including (1) revising the terminology and timeline associated with the district’s review of draft RRPs prior to public comment; and (2) clarifying the circumstances under which extensions to the implementation of an RRP or risk reduction measure may be granted. The Air District has also adopted related amendments to the Implementation Procedures associated with Rule 11-18 and has adopted an Addendum and Mitigation Monitoring and Reporting Program pursuant to CEQA to implement the mitigation measures in the RFEIR.

Contact Information

Name
Andrea Anderson
Agency Name
Bay Area Air Quality Management District
Job Title
Senior Air Quality Specialist
Contact Types
Lead/Public Agency / Project Applicant

Location

Counties
Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, Sonoma
Regions
Countywide, San Francisco Bay Area
Other Location Info
Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, southwestern Solano, and southern Sonoma counties

Notice of Determination

Approving Agency
Bay Area Air Quality Management District
Approving Agency Role
Lead Agency
Approved On
County Clerks
Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano, Sonoma
Final Environmental Document Available at
Copies of the Addendum, amended rule, Staff Report, RFEIR, and certain other relevant documents are available on the Air District’s website at www.baaqmd.gov/ruledev. Physical copies of the Addendum and all supporting documentation for this project, including the RFEIR and record of project approval, are available for public review at Air District headquarters at 375 Beale Street, Suite 600, San Francisco, CA 94105.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to the Recirculated Final Environmental Impact Report (RFEIR))
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print