Permit No. 19204-1 – Wastewater Master Plan, River Trunk Pump Station Improvements Project: Sanitary Sewer Pipelines
5 Documents in Project
Summary
SCH Number
2016062033
Lead Agency
City of Modesto
Document Title
Permit No. 19204-1 – Wastewater Master Plan, River Trunk Pump Station Improvements Project: Sanitary Sewer Pipelines
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2025
Document Description
Approval of Permit No. 19204-1, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To install two (a 27-inch diameter and a 48-inch diameter) sanitary sewer pipelines along the overflow channel of the Tuolumne River and under the Dry Creek channel, and two (a 30-inch diameter and a 42-inch diameter) sanitary sewer force mains extending from the planned sewer pump station under the 7th Street Bridge. One segment of the pipes will be installed in steel casing at the 7th Street and Union Pacific Railroad crossing; the other segment of the pipes will be encased in concrete under existing sanitary sewer pipes and AT&T fiber optic duct.
Contact Information
Name
Jennifer Calles
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Jim Alves
Agency Name
City of Modesto
Job Title
Project Manager
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project
Phone
Email
Location
Coordinates
Cities
Modesto
Counties
Stanislaus
Regions
Southern California
Other Location Info
The project is in the City of Modesto near the confluence of the Tuolumne River and Dry Creek, in Stanislaus County.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Stanislaus
Final Environmental Document Available at
The EIR, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. The Board’s administrative record related to the encroachment permit is available for public review at the Board’s office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.