Link Union Station Project

7 Documents in Project

Summary

SCH Number
2016051071
Lead Agency
Los Angeles County Metropolitan Transportation Authority (LSCMTA)
Document Title
Link Union Station Project
Document Type
NOD - Notice of Determination
Received
Posted
2/3/2026
Document Description
In Segment 1, the Project would increase the elevation of tracks south of the Vignes Street Bridge leading to the rail yard and add one new lead track. In Segment 2, the Project would replace the existing pedestrian passageway under the platforms and tracks with a new expanded passageway. In Segment 3, the Project would include a new viaduct structure connecting eight (8) new run-through tracks for regional and intercity trains, south of L.A. Union Station Platforms 2 through 5. These tracks would merge into a minimum of four (4) tracks on a viaduct over US-101 and continue south to connect to mainline tracks along the west bank of the Los Angeles River. As transportation mitigation for the primary project, Malabar Yard Improvements include closure of the 49th Street at-grade railroad crossing to provide storage capacity and, on 46th Street, the Project would construct approximately 1,000 feet of new track to provide dedicated connection for trains to travel between BNSF’s Malabar Yard and Los Angeles Junction.

Contact Information

Name
Cherry Zamora
Agency Name
California Transportation Commission
Job Title
Associate Deputy Director
Contact Types
Responsible Agency

Name
Carlos Montez
Agency Name
Los Angeles County Metropolitan Transportation Authority
Job Title
Project Manager
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Vernon
Counties
Los Angeles
Regions
Southern California
Other Location Info
The primary project is located at, and in the vicinity of, Los Angeles Union Station at 800 Alameda Street, with the northern limit at North Main Street (Mile Post 1.18) and the southern limit in the vicinity of Control Point (CP) Olympic south of Interstate 10 and Olympic Boulevard (Mile Post 142.70), in the City of Los Angeles in Los Angeles County. Malabar Yard Improvements would be located on 49th Street between Santa Fe Avenue and Hampton Street and on 46th Street between Pacific Boulevard and Soto Street in the City of Vernon in Los Angeles County.

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
Los Angeles Union Station Metro Library, 1 Gateway Plaza, Los Angeles, CA 90012, and www.linkunionstation.com

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Environmental Impact Report, Supplemental Environmental Impact Report, Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print