Blossom Valley Reservoir Replacement and I-8 Unencased Transmission Mains Project Addendum No. 2 to the Comprehensive Facilities Master Plan Final Impact Report

5 Documents in Project

Summary

SCH Number
2015111014
Lead Agency
Padre Dam Municipal Water District
Document Title
Blossom Valley Reservoir Replacement and I-8 Unencased Transmission Mains Project Addendum No. 2 to the Comprehensive Facilities Master Plan Final Impact Report
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2025
Document Description
Replacement of the Blossom Valley Reservoir (BVR) consists of two primary improvements: (1) demolition of the existing BVR and access road; and (2) construction of the new tank and access road. Demolition of the existing BVR would include demolition of the entire reservoir itself, as well as the access road and other asphalt concrete pavement, perimeter chain link fence and gates, groundwater monitoring well, AC drainage swales, and piping. The new tank would be a 3.25-MG, cylindrical, prestressed concrete tank with an inside diameter of 146 feet and a height of 30 feet. It would be partially buried, with 20 feet of the structure height below finished grade and would be centered within the existing reservoir location. The Labrador Lane pipeline crossing involves installation of approximately 1,800 feet of new 20-inch cement mortar lined and coated (CMLC) steel pipe that would connect to an existing 24-inch pipeline in Olde Highway 80, run northeast through Labrador Lane, cross perpendicularly under I-8 via jack and bore methods with a 30-inch steel casing, and re-connect to an existing 33-inch pipeline in Flinn Springs Road.

Contact Information

Name
Michael Hindle, PE
Agency Name
Padre Dam Municipal Water District
Job Title
Manager of District Projects
Contact Types
Lead/Public Agency

Location

Cities
Santee
Counties
San Diego
Regions
Citywide
Cross Streets
The Blossom Valley Reservoir site is along Via Caballo Road, approximately 0.7 mile north of I-8

Notice of Determination

Approving Agency
Padre Dam Municipal Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
Padre Dam Municipal Water District, 9300 Fanita Parkway, Santee, CA 92071

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to an EIR)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.