Matadero Creek Restoration and Bank Stabilization Project (Streambed Alteration Agreement No. EPIMS-SCL-47857-R3)
3 Documents in Project
Summary
SCH Number
2015102051
Lead Agency
City of Los Altos Hills
Document Title
Matadero Creek Restoration and Bank Stabilization Project (Streambed Alteration Agreement No. EPIMS-SCL-47857-R3)
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed the Streambed Alteration Agreement number EPIMS-SCL-47857-R3, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the Town of Los Altos Hills, as represented by WooJae Kim.
The Project involves repairing an existing headcut on Matadero Creek that has formed at the outfall of an existing box culvert. After the headcut is repaired and the bank is stabilized, native plant restoration will occur. For grade control structure activities, Permittee will use a coffer dam to dewater the stream, Flow Diversion Plan. Water will be captured in a pipe and directed around the Project area.
Contact Information
Name
Emily Galli
Agency Name
CA Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Suzanne Avila
Agency Name
Town of Los Altos Hills
Job Title
Lead Agency Contact
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Los Altos Hills
Counties
Santa Clara
Regions
San Francisco Bay Area
Parcel #
182-07-059
Other Location Info
The project is located along Page Mill Road and includes a portion of Matadero Creek, between Berry Hill Court and Arastradero Road, approximately one-quarter of a mile southwest of Interstate 280 (I-280) in the Town of Los Altos Hill, Santa Clara County, State of California, GPS Latitude 37.385986 and Longitude -122.165064, Assessor’s Parcel Number 182-07-059.
Notice of Determination
Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
The final environmental impact report prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.