Lake Wohlford Dam Replacement Project (Lake or Streambed Alteration Agreement EPIMS-SDO- 25082-R5)

7 Documents in Project

Summary

SCH Number
2015041091
Lead Agency
City of Escondido
Document Title
Lake Wohlford Dam Replacement Project (Lake or Streambed Alteration Agreement EPIMS-SDO- 25082-R5)
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SDO-25082-R5), pursuant to Fish and Game Code section 1602, to the project Applicant, City of Escondido. The project entails constructing a replacement dam immediately downstream (west) of the existing dam and partially deconstructing the existing dam by removing hydraulic fill material. A new outlet tower would be constructed on the upstream side of the dam, built as a cast-in-place, reinforced concrete structure anchored to the dam’s face and extending to the dam crest at elevation of 1,490 feet above mean sea level (AMSL). The outlet tower would be connected to the proposed dam’s downstream emergency release valve and appurtenances located on the south side of the new stilling basin and spillway.

Contact Information

Name
Andrew Aitken
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Mike Strong
Agency Name
City of Escondido
Job Title
Planner
Contact Types
Lead/Public Agency

Location

Cities
Unincorporated San Diego County
Counties
San Diego
Regions
Southern California
Other Location Info
The project is located at Escondido Creek and Lake Wohlford, in unincorporated San Diego County, State of California; Latitude 33.16720, Longitude -117.00540; Assessor’s Parcel Number 190-110-15-00.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
The Final EIR prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print