Santa Barbara Airport Master Plan
5 Documents in Project
Summary
SCH Number
2014061096
Lead Agency
City of Santa Barbara
Document Title
Santa Barbara Airport Master Plan
Document Type
ADM - Addendum
Received
Present Land Use
Transportation:Air/Heliport
Document Description
The Proposed Project has been developed to accommodate existing and forecast passenger demands at the Airport, as identified in collaboration with the Federal Aviation Administration (FAA). The Proposed Project consists of improvements to the John T. Rickard Airline Terminal (Terminal) that would include an additional 16,500 square feet (sf) (approximately 310 sf larger than presented in the FPEIR) to the footprint of the Terminal and the redevelopment of approximately 20,400 square yards (sy) of Terminal and overflow apron (approximately 11,200 sy smaller than presented in the FPEIR). The airside pavement would not be expanded beyond existing limits.
Additionally, compared to what was presented in the FPEIR, the Proposed Project would result in one fewer passenger loading bridge and a new access roadway instead of the realignment of the Terminal loop road. The adjustment to surface parking would result in the demolition of Building 122, which was not specifically addressed in the FPEIR, but would have been necessary for the expansion of the short-term parking lot and the extension of the Terminal loop road that were analyzed in the FPEIR. A portion of Building 122 is used as a breakroom for Airport employees, and the rest is leasable space. Following demolition, the breakroom would be accommodated within the redeveloped Terminal area.
Contact Information
Name
Jessica Metzger
Agency Name
City of Santa Barbara
Job Title
Airport Planner
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Coordinates
Cities
Goleta, Santa Barbara
Counties
Santa Barbara
Regions
Citywide, Countywide
Cross Streets
James Fowler Road and Moffett Place
Zip
93117
Total Acres
948
Jobs
9
Parcel #
073-450-003
State Highways
Hwy 217, US 101
Railways
UPRR
Airports
SBA
Schools
UCSB, La Patera Elementary, St. Raphael School
Waterways
Goleta Slough, Pacific Ocean, Deveraux Slough
Township
4N
Range
28W
Section
17
Base
SBBM
Notice of Completion
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 5 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Water Resources (DWR), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB)
Development Types
Transportation:Air/Heliport
Local Actions
Master Plan, Redevelopment
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Solid Waste, Transportation, Utilities/Service Systems
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.