San Joaquin River Conservancy River West Fresno, Eaton Trail Extension Project

9 Documents in Project

Summary

SCH Number
2014061017
Lead Agency
California San Joaquin River Conservancy (SJRC)
Document Title
San Joaquin River Conservancy River West Fresno, Eaton Trail Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
10/7/2025
Document Description
The 2017 EIR for the San Joaquin River Conservancy River West Fresno, Eaton Trail Extension Project has the study area ending at the fence on the west side of the existing SR 41 undercrossing. The proposed Project (Addendum #2) includes adding sidewalk between the existing curb and the concrete embankment on the south side of the undercrossing of Perrin Ave and adding an accessible curb ramp at the east side to provide a pedestrian connection to the current terminus of the existing Lewis S. Eaton Trail on the east side of SR 41. Because the proposed Project is meant to extend the existing trail which currently ends on the east side of SR 41, a CEQA Addendum to the 2017 EIR is required as this scope of work is outside the 2017 EIR study area & not included in the project description. CEQA Guidelines Section 15164 allows for the Lead Agency to adopt an Addendum to an existing approved CEQA document when non-substantial changes to the existing approved CEQA document are necessary. The proposed project changes are for an additional section of sidewalk, curb and gutter of approximately 320 feet in length that go under SR 41 to connect the trail on both sides of the freeway

Contact Information

Name
Kari Daniska
Agency Name
San Joaquin River Conservancy
Job Title
Executive Officer
Contact Types
Lead/Public Agency

Location

Cities
Fresno
Counties
Fresno
Regions
Citywide, Countywide, Statewide
Cross Streets
Palm Ave and Nees Ave
Zip
93711
Total Acres
500
Jobs
50
Parcel #
401-021-32ST; 401-021-33ST; 401-021-34ST; 401-021-35ST; 401-021-37S; 401-021-38S; 402-030-24ST;
State Highways
State Highway 41
Waterways
San Joaquin River

Notice of Determination

Approving Agency
San Joaquin River Conservancy
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print