City of Half Moon Bay Routine Maintenance Agreement Project (Streambed Alteration Agreement EPIMS-SMO-43252-R3)
6 Documents in Project
Summary
SCH Number
2013082031
Lead Agency
City of Half Moon Bay
Document Title
City of Half Moon Bay Routine Maintenance Agreement Project (Streambed Alteration Agreement EPIMS-SMO-43252-R3)
Document Type
NOD - Notice of Determination
Received
Posted
6/9/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Routine Maintenance Agreement (EPIMS-SMO-43252-R3), pursuant to Fish and Game section 1602, to the project Applicant, City of Half Moon Bay as represented by Douglas Garrison.
The project is limited to: periodic activities necessary to maintain the water transport capacity of drainages, ditches and channels, and the structural and functioning integrity of existing flood control and sediment detention structures on or affecting streams. Routine maintenance activities include sediment, silt, trash and debris removal to clear channel obstructions; vegetation management; repair of existing bank protection; removal of non-native vegetation; and in-kind culvert repair or replacement.
Contact Information
Name
Jason Teichman
Agency Name
CA Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
Douglas Garrison
Agency Name
City of Half Moon Bay
Job Title
Lead Agency Contact
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Half Moon Bay
Counties
San Mateo
Regions
San Francisco Bay Area
Other Location Info
The routine maintenance project is located at fifteen ditches and drainages within the City of Half Moon Bay limits, in San Mateo County, California
Notice of Determination
Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
The Final MND prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW's record of project approval as a Responsible Agency is available at CDFW's regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.