Storm Channel Maintenance Programmatic Permit, MND 12-822

4 Documents in Project

Summary

SCH Number
2012121067
Lead Agency
City of San Marcos
Document Title
Storm Channel Maintenance Programmatic Permit, MND 12-822
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2026
Document Description
The Project proposes to continue conducting routine flood control maintenance with the removal and trimming of vegetation, the removal of sediment at select locations, and the removal of trash, litter, and debris within and around 26 stormwater facilities throughout the City of San Marcos. The focus of the Project is on channels/ditches, basins, and inlet/outlet drain structures because these facilities require proactive maintenance to ensure adequate flood risk reduction. Channels and ditches include built structures (concrete-lined or earthen-bottom) created specifically for the conveyance of stormwater, and natural channels that carry water through urbanized areas throughout the City of San Marcos

Contact Information

Name
Alan Monji
Agency Name
Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Gina Jackson
Agency Name
City of San Marcos
Job Title
Senior Office Specialist
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Regions
Citywide
Cross Streets
26 Locations Citywide
Zip
92069
Total Acres
4.99
State Highways
State Route 78
Schools
CSU San Marcos
Waterways
San Marcos Creek, Agua Hedionda Creek
Other Location Info
Channel maintenance at 26 discrete locations in the City of San Marcos

Notice of Determination

Approving Agency
REGIONAL WATER QUALITY CONTROL BOARD
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
City of San Marcos Planning Division, 1 Civic Center Drive, San Marcos, CA 92069

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print