County-Wide Long-Term Routine Maintenance Permitting Program
14 Documents in Project
Summary
SCH Number
2012111011
Lead Agency
Orange County
Document Title
County-Wide Long-Term Routine Maintenance Permitting Program
Document Type
NOD - Notice of Determination
Received
Posted
3/11/2026
Document Description
The County-Wide Long-Term Routine Maintenance Permitting Program Manual lists the routine maintenance activities within multiple existing flood control facilities, as well as beneath existing bridges crossing over waterways, located throughout the County of Orange (County). Flood control maintenance activities would include channel and basin/dam maintenance (i.e., cleaning, silt removal, slope maintenance/repair), landscape maintenance and vegetation control/removal, insect/rodent control, rip-rap installation and repair, structural inspection/cleaning, installation of storm drain pipes and underdrains, fabrication and installation of headwalls, removal/replacement of concrete lining, and the repair and backfill of washouts. Bridge maintenance activities would include maintenance of waterway side slope and invert classing in the immediate vicinity of the bridge, repair of concrete bridge elements within the channel, and cleaning and painting of steel bridge members.
Contact Information
Name
Giles Matthews
Agency Name
Orange County
Job Title
Regulatory Permitting Manager
Contact Types
Lead/Public Agency
Phone
Name
Virginia Gomez
Agency Name
Orange County
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Location
Cities
All of Orange County
Counties
Orange
Regions
Countywide, Unincorporated
Other Location Info
Orange County
Other Information
All Channel and Bridge facilities under the jurisdiction of the County of Orange
Notice of Determination
Approving Agency
OCPW / OC Infrastructure Programs
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
https://ocpublicworks.com/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum No. 1 to IP 11-444 IS/MND)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
