Diamond Mountain Forest and Meadow Restoration Project (SNC 510)
Summary
                SCH Number
            
            
                2012069015
            
        
                    Lead Agency
            
            
                Sierra Nevada  Conservancy  
                
            
        
                Document Title
            
            Diamond Mountain Forest and Meadow Restoration Project (SNC 510)
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    6/14/2012
                
            
                Document Description
            
            The Honey Lake Valley Resource Conservation District has requested $273,735 from the Sierra Nevada Conservancy's Proposition 84 Healthy Forests Grants Program to fund fuel reduction treatments on 477 acres within the Diamond Mountains. The proposed project would implement fuels reduction treatment through a combination of mechanical thinning on approximately 420 acres; hand thinning, pruning, and slash disposal on approximately 48 acres; and removal of conifers less than 12 inches in diameter at breast height from approximately nine acres on two meadows. Woody debris and biomass generated would be utilized to the maximum extent feasible for chips to be delivered to a waste generation facility or for fuel wood. Slash would be piled and burned or removed, chipped, and masticated, as appropriate.
        Contact Information
                        Name
                    
                    
                        Jim Branham
                    
                
                        Agency Name
                    
                    
                        Sierra Nevada Conservancy
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Cities
                
                Susanville
            
                    Counties
                
                Lassen
            Notice of Determination
                        Approving Agency
                    
                    
                        Sierra Nevada Conservancy                                       
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
