Mountain View High School Expansion Project
6 Documents in Project
Summary
SCH Number
2011092006
Lead Agency
Mountain View-Los Altos Union High School District
Document Title
Mountain View High School Expansion Project
Document Type
ADM - Addendum
Received
Present Land Use
The project proposes the enlargement and modernization of existing gymnasium building including enclosing of exterior space under the existing roof overhangs to create lobby spaces, roof replacement, adding air conditioning, upgrading building HVAC systems, fixtures and finishes, new landscaping and seating area adjacent to the western edge of the building. The previous project included constructing a new two-story 55,000 square-foot classroom building, a one-story 7,648 square-foot engineering building, an approximately 43,700 square-foot student services building, and an approximately 10,350 square-foot auxiliary gymnasium building, as well as re-purposing the existing cafeteria into a Performing Arts classroom, modernizing Packard Hall, altering and re-purposing of the existing small gym, installing artificial turf at existing fields, and converting spaces that are were originally proposed to be relocated to student services building to future library use.
Document Description
The project proposes the enlargement and modernization of existing gymnasium building including enclosing of exterior space under the existing roof overhangs to create lobby spaces, roof replacement, adding air conditioning, upgrading building HVAC systems, fixtures and finishes, new landscaping and seating area adjacent to the western edge of the building. The previous project included constructing a new two-story 55,000 square-foot classroom building, a one-story 7,648 square-foot engineering building, an approximately 43,700 square-foot student services building, and an approximately 10,350 square-foot auxiliary gymnasium building, as well as re-purposing the existing cafeteria into a Performing Arts classroom, modernizing Packard Hall, altering and re-purposing of the existing small gym, installing artificial turf at existing fields, and converting spaces that are were originally proposed to be relocated to student services building to future library use.
Contact Information
Name
Chinmay Sapre
Agency Name
Mountain View Los Altos High School District
Job Title
Associate Project Manager
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Coordinates
Cities
Mountain View
Counties
Santa Clara
Regions
Countywide
Zip
94040
Other Location Info
3535 Truman Avenue
Notice of Completion
State Reviewing Agencies
California Department of Education, California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Resources Recycling and Recovery, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 4 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB)
Development Types
Educational (Enlargement and Modernization of existing Gymnasium Building)
Local Actions
Project Approval - Addendum approving tree removals related to the previosuly apprpved Mountain View High School Expansion Project
Project Issues
Vegetation
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Final Document(s) [Approved_Certified draft environmental documents]
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.
