Addendum to the Berth 87 USS Iowa Project EIR
4 Documents in Project
Summary
SCH Number
2011081097
Lead Agency
Port of Los Angeles
Document Title
Addendum to the Berth 87 USS Iowa Project EIR
Document Type
NOD - Notice of Determination
Received
Posted
1/6/2026
Document Description
The Addendum changes the Project description by reducing the size of the visitor center to be approximately 17,161 sq. ft., updating construction activities to include the installation of piles, and including approximately 50,000 sq. ft. of renovated park space. The remaining construction components of the visitor center and its operations were included in the original assessment. Key features of the proposed Project would include a multipurpose visitor center, community gathering space, educational exhibits, veterans memorials with local, state, and national significance, maritime equipment displays, public art, and a child’s play area. No new significant environmental impacts or substantial increase in the severity of previously identified significant effects have been identified from these Project modifications.
Contact Information
Name
Nicole Enciso
Agency Name
Port of Los Angeles
Job Title
Marine Environmental Supervisor
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
San Pedro
Counties
Los Angeles
Regions
Citywide
Cross Streets
Harbor and First Street
Zip
90731
Other Location Info
Berth 87
Notice of Determination
Approving Agency
Los Angeles Harbor Department
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
www.portoflosangeles.org/ceqa
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.