Inspire 2035

13 Documents in Project

Summary

SCH Number
2011071005
Lead Agency
South Orange County Community College District
Document Title
Inspire 2035
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2025
Document Description
Previous Projects 2011 Facilities Master Plans. The 2011 FMPs for Saddleback College and Irvine Valley College were adopted to serve as a "blueprint for future development" of the campuses from 2011 through the year 2031 planning horizon. The 2011 FMPs construction and renovation projects included an increase in the capacities of campus facilities in order to meet the projected growth in student enrollments and faculty. The resulting 20-year growth projections were translated into assignable square feet (ASF) and programmed for in the 2011 FMPs planning horizon through 2031. 2020 Facilities Master Plan. To provide updated facilities plans for changing student and faculty needs, the District prepared the 2020 FMP for the Irvine Valley College and Saddleback College campuses that included the same geographical areas that were planned for disturbance by the 2011 FMPs. The 2020 FMP was based on student enrollment forecasts that are developed by the California Community Colleges Chancellor's Office (CCCCO), which projected lower enrollment in the year 2030 for each campus that is less than what was anticipated in the 2011 FMPs. The 2011 FMPs anticipated an enrollment of 26,353 at Irvine Valley College and an enrollment of 40,668 at Saddleback College in 2030. The 2020 FMP identified 7,820 fewer enrollments at Irvine Valley College, and 8,354 fewer enrollments at Saddleback College in 2030 than anticipated by the 2011 FMPs. Proposed Project To provide updated facilities plans for changing student and faculty needs, the District has prepared Inspire 2035 to plan that includes the same geographical areas that were previously evaluated for campus facilities by the 2011 FMPs and Final FMP EIR and largely includes completion of projects that were included in the 2011 FMPs and 2020 FMP and the enhancement of campus facilities. IRVINE VALLEY COLLEGE Several of the facilities that were identified in the 2011 FMPs and 2020 FMP for the Irvine Valley College main campus are currently under construction. In addition, a large majority of the Irvine Valley College facility projects that are listed in Inspire 2035 are the continuation of existing projects and plans, as detailed below. Student Services and Student Union Buildings and Open Space Quad. Consistent with the 2020 FMP, the Inspire 2035 indicates a new Student Services building would be developed and the quad to the southwest of the new Student Services building would be redeveloped with outdoor seating, dining, and areas for activities. Consistent with the 2020 FMP, the Inspire 2035 indicates a new Student Union building would be developed to the south of the open space quad. The Student Services and Student Union buildings would total approximately 77,099 GSF and 52,492 ASF. Instructional Building – A Quad. Consistent with the 2020 FMP, the Inspire 2035 includes removal of improvements and development of a new Instructional Building A that would be 37,989 GSF and a provision of renovated courtyard areas and pedestrian paths. PE100 Building. Consistent with the 2011 FMP and the 2020 FMP, the existing aged PE100 building (Health Fitness Complex) would be demolished and a new PE100 building would be developed. The new building would provide 14,878 GSF and 12,042 ASF. Wellness Court. Consistent with the 2020 FMP, the Inspire 2035 includes a new Wellness Court in between buildings PE100 and PE200 to support outdoor instruction and recreation activities. A continuation of the City of Irvine Community Trail would cross the northern portion of the area. On the east side of the new PE100 building, one existing tennis court would be removed, and four new pickle ball courts would be developed. Student Housing. Inspire 2035 includes student housing on a 3.4-acre site, which was previously evaluated in the 2023 Addendum to the 2011 Facilities Master Plan EIR. The 3.4-acre site identified for student housing was planned for a parking garage in the 2011 FMP. The student-housing buildings included up to four buildings that would be three-to-four stories in height and surrounded by outdoor recreation and open space courtyard areas. SAC Building Renovation. Consistent with the 2020 FMP, the Inspire 2035 includes renovation of the Student Activities Center building to provide 12,361 GSF and 9,885 ASF. A pedestrian pathway from the renovated building would provide a connection to the new Student Services building and center of campus. B200 Building Improvements – Classrooms/Offices. Consistent with the 2020 FMP, the Inspire 2035 includes improvements to the B200 building (Mathematics and Physical Sciences) for renovation of the general classrooms and offices. The renovated building would provide 34,131 GSF and 20,749 ASF. B300 Building Renovation. Consistent with the 2020 FMP, the Inspire 2035 includes B300 building renovations for Science and Math instructional program needs. The renovation would be 28,330 GSF and 18,383 ASF and include classrooms, labs, offices, and study/collaboration spaces. PE200 Building Renovation. Consistent with the 2020 FMP, the Inspire 2035 includes a comprehensive renovation for the PE200 building (Hart Gymnasium) to address building deficiencies and include space for campus janitorial services. The renovated building would be 26,577 GSF and 21,617 ASF. M&O Complex. Consistent with the 2020 FMP, the Inspire 2035 includes improvements for the M&O Complex including removal of the temporary buildings and replacement with permanent structures. The renovated building space would provide 8,228 GSF and 5,287 ASF. Fine Arts Promenade. Consistent with the 2011 FMP and the 2020 FMP, direction to renovate the existing campus pedestrian pathways between the Fine Arts Plaza and PE Plaza, an outdoor area through the center of campus would be developed to provide large outdoor areas for “working” spaces with defined areas for sculpting, drawing, and painting. Additionally, areas would be developed for outdoor meditation and collaborative study. Parking Lots and Solar Canopies. Consistent with the 2020 FMP, the Inspire 2035 includes parking lot improvements, solar photovoltaic (PV) canopies, and EV charging. New Inspire 2035 Projects The Inspire 2035 plan for Irvine Valley College includes three new small accessory structures that were not previously included in FMPs, which are detailed below. Fine Arts Promenade Coffee Structure. The Inspire 2035 includes a 500 square-foot coffee structure to be developed in the Fine Arts Promenade that would be integrated into a custom canopy covering. The canopy would accommodate up to 50 patrons. Performing Arts Yard. The Inspire 2035 includes reconfiguration of the Performing Arts Yard loading dock area with a new 1,800 square foot structure to provide a workable back of house to support the Performing Arts Center and improve walkways and roadways to facilitate the movement, storage, delivery, and loading of larger sets. Baseball Team Room The Inspire 2035 includes a team room for the baseball team at IVC that would be approximately 2,000 square feet and located adjacent to the north side of the existing baseball field. SADDLEBACK COLLEGE Several of the facilities that were identified in the 2011 FMPs and 2020 FMP for Saddleback College are currently under construction, including the Science and Math Complex (now known as the Math and Computer Science Building). In addition, a large majority of the Saddleback College facility projects that are listed in Inspire 2035 are the continuation of existing projects and plans. The Inspire 2035 projects for the Saddleback College campus are described below. College Center Reconstruction. This improvement was previously identified as the Student Union project in the 2020 FMP as a replacement project with a corresponding parking structure. This improvement, as included in Inspire 2035, would modernize and expand the existing College Center building to enhance its functionality and safety and would not include a new parking structure. This project includes comprehensive interior remodeling, seismic, plumbing, and electrical upgrades, installation of new fixtures, and a refreshed exterior with an expanded entrance. The building would accommodate key departments, including executive and administrative offices, extended learning programs, student government and student development offices, economic workforce and development, a student health and wellness center, inclusion center, basic needs center, bookstore, faculty center. Additionally, the cafeteria would be moved to the first floor for improved accessibility. Fine Arts Complex Replacement. The 2011 FMP included renovation of the Fine Arts building complex. Consistent with the 2020 FMP, Inspire 2035 includes construction of a new Fine Arts complex to replace the existing to correct building deficiencies and support current and projected program needs. The new complex would have 61,858 GSF and 40,783 ASF and would improve all instructional spaces, faculty offices, both theaters, and all support spaces. A new drop-off is proposed to improve access to this area of campus. Wellness Center and Volleyball. Consistent with the 2020 FMP a new Wellness Center would be developed. The new building would be 25,000 GSF and 11,209 ASF and would be developed to integrate into the sloped site and tie into outdoor open space areas. The upper level of the building would open to a new Wellness Court that would support active and passive wellness activities and facilitate pedestrian movement. The lower level would open to a terrace that would overlook the proposed sand volleyball courts to the north. This would replace PE600. PE Complex Replacement. Consistent with the 2011 FMP and the 2020 FMP, the Inspire 2035 includes construction of a new Fitness and Wellness Center next to the stadium, the 2020 FMP includes replacement of the existing PE complex. Buildings PE100, PE200, PE300, PE400, and PE500 would be demolished and a new Physical Education Complex would be constructed. The new complex would have 55,900 GSF and 40,141 ASF and would provide state-of-the-art facilities to support physical education programs. Student Housing. As detailed in the 2020 FMP, new student housing would be developed in an area that was planned for surface level parking by the 2011 FMP. The new student-housing buildings would be three to four stories in height, which is consistent with the existing buildings on campus, and would be surrounded by outdoor recreation and open space courtyard areas. The existing surface parking lots would provide student-housing parking. TAS Renovation. Inspire 2035, includes renovating (or possibly replacing) the Technology/Applied Science (TAS) building to address building deficiencies and to be repurposed for campus police and information technology. The building would have 36,601 GSF and 23,608 ASF. M&O Grounds and Transportation. Consistent with the 2020 FMP, the Inspire 2035, includes relocating the existing programs in the M1 and M2 buildings to the ATEP facility and the buildings would be renovated for use for grounds and transportation services. The M1 and M2 buildings would provide a consolidated service area of the campus to support deliveries and storage of materials, equipment, and vehicles. Parking Lot Solar Canopies and EV Chargers. Consistent with the 2020 FMP, the Inspire 2035, includes installation of solar canopies throughout campus in designated parking lots. In addition, consistent with updated California Energy Code requirements, Level 2 and Level 3 EV chargers would be installed in all parking lots containing solar canopies. New Inspire 2035 Projects The Inspire 2035 plan for Saddleback College includes improvements to the campus energy systems, two new small accessory structures, replacement of one structure, and improvements to the baseball field that were not previously included in FMPs, which are detailed below. Central Plant Renovation. Inspire 2035 includes renovation of the existing Central Plant Building, decommissioning the co-generation system, replacement of the existing equipment (chillers, cooking towers, pumps, boilers), upgrading associated infrastructure, adding two Thermal Energy Storage (TES) tanks (One for the chilled water [940K gallons tank 65’w x 42’h cast-in place concrete] and one for the hot water loop [78K gallons 21’w x 36’h steel]), and de-coupling the swimming pool. The new systems would provide additional campus resiliency and redundancy and would maximize the benefit of the planned solar and 12kV infrastructure upgrades. The proposed systems would support the energy and sustainability goal of striving to reduce greenhouse gas emissions to 75% by 2030. Battery Energy Storage System. To support the solar canopies, a battery energy storage system would be installed in Parking Lot 4 adjacent to the Central Plant as part of the Solar Canopies Project. The system would provide backup power, provide redundancy to the electrical grid, and reduce electrical costs. Saddleback Coffee Structure. The Inspire 2035 includes a 2,000 square foot coffee structure that would be located to the south of the existing Tennis Center Complex and west of the proposed Student Housing location. Saddleback Baseball Field. Inspire 2035 includes changing the grass baseball field to turf, removing and replacing dugouts, adding a small restroom structure, adding a retaining wall to address slope issue adjacent to left field, and replacement of netting. Saddleback Horticulture/Biology Greenhouse. Inspire 2035 includes replacing the existing horticulture building at the same footprint, adding a restroom structure, and 1,000 square foot greenhouse for biology. ATEP Under Inspire 2035, no specific development is proposed on the ATEP campus. The Inspire 2035 notes that approximately 11.17-acres of land within ATEP is under negotiation for lease with Top Tennis Management and 27.4-acres is in negotiation with Victory AI Academy. However, no additional specific development is currently proposed. Therefore, no new construction or operations is considered for ATEP within the Addendum. Any future proposed development within the ATEP area would be evaluated to identify its consistency with the Tustin Legacy Development Framework and the buildout as detailed in the FEIS/EIR.

Contact Information

Name
Ann-Marie Gabel
Agency Name
South Orange County Community College District
Job Title
Vice Chancellor
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Irvine, Mission Viejo
Counties
Orange
Regions
Citywide, Countywide
Cross Streets
Irvine Center Drive and Jeffrey Rd, Marguerite Pkwy and Avery Pkwy, Redhill Ave and Valencia Av
Zip
92618, -26
Total Acres
S:200;I:100;A:56
State Highways
I-405, I-5, SR-133, SR-73
Railways
metrolink
Schools
Goddard, Oso Grande, Niguel Hills, OCASA, Alderwood, turtle rock
Waterways
san diego creek
Township
7S
Range
8W
Section
24
Base
SanBern

Notice of Determination

Approving Agency
South Orange County Community College District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
South Orange County Community College District offices at Saddleback College, 28000 Marguerite Parkway, Mission Viejo, CA 92692

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.