One Lake (Lake or Streambed Alteration Agreement No. EPIMS-SOL-59242-R3)
19 Documents in Project
Summary
SCH Number
2010042093
Lead Agency
City of Fairfield
Document Title
One Lake (Lake or Streambed Alteration Agreement No. EPIMS-SOL-59242-R3)
Document Type
NOD - Notice of Determination
Received
Posted
3/23/2026
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SOL-59242-R3, pursuant to Section 1602 of the Fish and Game Code to One Lake Holding, LLC.
The Project is limited to new construction of a storm drain outfall in Union Creek (Location 1) and placement of a new culvert and construction of a new headwall in an unnamed tributary to McCoy Creek (Location 2). The work taking place under this Agreement is associated with the One Lake Mixed Use Development Area (also known as the Canon Station Project) which has two other associated permits; Canon Station Incidental Take Permit (ITP) 2081-2016-020-03 (Expires December 31, 2028), and 1600-2018-0051-R3 (expires December 31, 2027).
Location 1: New construction of the outfall will occur at the south bank of Union Creek and will consist of a 24 inch diameter pipe with placement of 25 cubic yards of rock slope protection (RSP). The concreted RSP that surrounds the pipe will be 36 square feet and will be placed over nonwoven RSP and contoured to the existing slope. Additional RSP will be placed on each side of the concreted RSP and will extend across the creek bottom to the toe of the north bank of the creek, additional RSP will not be concreted. One eucalyptus tree (Eucalyptus sp.) will be removed, this tree removal is covered under Agreement No. 1600-2018-0051-R3. No other trees will be removed under this Agreement. Work will occur when the creek is dry.
The Project activities occurring at Location 1 will result in 0.02 acres (10 linear feet) of temporary impacts and 0.02 acres (10 linear feet) of permanent impacts to wetlands within Union Creek.
Location 2: A new 36 inch diameter culvert will be placed at the downstream end of an unnamed tributary to McCoy Creek and a new headwall will be constructed to convey and direct high flows to address ongoing flooding issues. The existing 18 inch diameter storm drain will remain in place to capture historic flows. Berms will be installed along the west edge of the slough to provide additional protection from storm flows. Work will occur out of the wetted channel.
The Project activities occurring at Location 2 will result in 0.18 acres (300 linear feet) of permanent impacts associated with the berm construction to the unnamed tributary to McCoy Creek.
Contact Information
Name
Jordan Beaton
Agency Name
CA Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Name
David Feinstein
Agency Name
City of Fairfield
Job Title
Lead Agency Contact
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Fairfield
Counties
Solano
Regions
San Francisco Bay Area
Other Location Info
The Project is located at two locations in the County of Solano, State of California:
1) Union Creek at Latitude 38.30432°, Longitude -121.94910°
2) Unnamed tributary to McCoy Creek at Latitude 38.298089°, Longitude -121.963565°
Notice of Determination
Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Solano
Final Environmental Document Available at
The Final EIR prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.