Permit No. 20073 ARCF / Natomas PACR / NLIP / Improvements Project Phase 4b: Garden Highway Overhead Communications Relocation

51 Documents in Project

Summary

SCH Number
2009112025
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Permit No. 20073 ARCF / Natomas PACR / NLIP / Improvements Project Phase 4b: Garden Highway Overhead Communications Relocation
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2026
Document Description
Approval of Permit No. 20073, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To remove an existing utility pole located at the landside levee toe; to install a new 55-foot Douglas fir wood pole at the waterside approximately 113 feet from the levee centerline, set at a depth of 8 feet; and to relocate the existing overhead communication line by remounting it from the existing pole onto a PG&E-owned pole (Board Permit No. 19977) located approximately 105 feet from the landside levee toe and onto the new AT&T pole authorized under this permit. The overhead communication line crossing the levee will maintain a clearance of 21 feet above the top of the levee. This utility work is associated with Natomas Basin Civil Works Reach F Project.

Contact Information

Name
John Bassett
Agency Name
Sacramento Area Flood Control Agency (SAFCA)
Job Title
Director of Engineering
Contact Types
Lead/Public Agency

Name
Andrea Galeste
Agency Name
AT&T California
Job Title
Project Manager
Contact Types
Project Applicant / Parties Undertaking Project

Name
Angela Nguyen-Tan
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Sutter
Regions
Northern California
Other Location Info
The project is located at the intersection of Natomas Road and Riego Road at approximately 38.75132 ° N, -121.494477 °W, Levee Mile 10.45 Unit No. 3, Reclamation District 1000, Steelhead Creek, Sutter County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
Sacramento Area Flood Control Agency, 1007 7th Street, 7th floor, Sacramento, CA 95824. The EIR, prepared by the lead agency for the project, is available to the general public at the lead agency’s office listed above. The Board’s administrative record related to the Board permit is available for public review at the Board’s office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print